feat: rename rails/ to tools/ and add service tool suites
Rename the `rails/` directory to `tools/` for agent discoverability — agents frequently failed to locate helper scripts due to the non-intuitive directory name. Add backward-compat symlink `rails/ → tools/`. New tool suites: - Authentik: auth-token, user-list, user-create, group-list, app-list, flow-list, admin-status (8 scripts) - Coolify: team-list, project-list, service-list, service-status, deploy, env-set (7 scripts) - Woodpecker: pipeline-list, pipeline-status, pipeline-trigger (3 stubs) - GLPI: session-init, computer-list, ticket-list, ticket-create, user-list (6 scripts) - Health: stack-health.sh — stack-wide connectivity check Infrastructure: - Shared credential loader at tools/_lib/credentials.sh - install.sh creates symlink + chmod on tool scripts - All ~253 rails/ path references updated across 68+ files Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
@@ -870,7 +870,7 @@ Required sequence:
|
||||
1. Merge PR to `main` (squash) via Mosaic wrapper.
|
||||
2. Monitor CI to terminal status:
|
||||
```bash
|
||||
~/.config/mosaic/rails/git/pr-ci-wait.sh -n <PR_NUMBER>
|
||||
~/.config/mosaic/tools/git/pr-ci-wait.sh -n <PR_NUMBER>
|
||||
```
|
||||
3. Require green status before claiming completion.
|
||||
4. If CI fails, create remediation task(s) and continue until green.
|
||||
@@ -885,8 +885,8 @@ Woodpecker note:
|
||||
Before pushing a branch or merging a PR, guard against overlapping project pipelines:
|
||||
|
||||
```bash
|
||||
~/.config/mosaic/rails/git/ci-queue-wait.sh --purpose push -B main
|
||||
~/.config/mosaic/rails/git/ci-queue-wait.sh --purpose merge -B main
|
||||
~/.config/mosaic/tools/git/ci-queue-wait.sh --purpose push -B main
|
||||
~/.config/mosaic/tools/git/ci-queue-wait.sh --purpose merge -B main
|
||||
```
|
||||
|
||||
Behavior:
|
||||
|
||||
Reference in New Issue
Block a user