Objective

Validate the complete Non-AI Coordinator system works autonomously through end-to-end testing.

Implementation Details

Execute the final PoC test from Part 5:

Test scenario:

  • Queue: 5 issues (mix of low, medium, high difficulty)
  • Run autonomous orchestrator
  • Verify all issues completed without manual intervention
  • Verify quality gates enforced for all commits
  • Verify context managed (compaction, rotation as needed)
  • Verify cost optimization (cheapest agents used)

This validates all success metrics from the PoC plan.

Context Estimate

  • Files to modify: 2 (e2e test file, validation report)
  • Implementation complexity: medium (20,000 tokens)
  • Test requirements: high (15,000 tokens)
  • Documentation: heavy (5,000 tokens)
  • Total estimated: 58,500 tokens
  • Recommended agent: glm

Difficulty

medium

Dependencies

  • Blocked by: #161 (COORD-012)

Acceptance Criteria

  • E2E test completes all 5 issues autonomously
  • Zero manual interventions required
  • All quality gates pass before issue completion
  • Context never exceeds 95% (rotation triggered if needed)
  • Cost optimized (>70% on free models if applicable)
  • Success metrics report validates all targets
  • Tests pass (85% coverage minimum)

Testing Requirements

  • Create 5 test issues (1 high, 2 medium, 2 low difficulty)
  • Execute full orchestration loop
  • Measure autonomy (count interventions)
  • Measure quality (gate pass rate)
  • Measure cost optimization (agent assignment)
  • Measure context management (exhaustion events)
  • Generate validation report
  • Coverage: 85% minimum

Success Metrics Validation

  • Autonomy: 100% completion without human intervention
  • Quality: 100% of commits pass quality gates
  • Cost optimization: >70% issues use free models
  • Context management: 0 agents exceed 95% without rotation
  • Estimation accuracy: Within ±20% of actual usage
## Objective Validate the complete Non-AI Coordinator system works autonomously through end-to-end testing. ## Implementation Details Execute the final PoC test from Part 5: Test scenario: - Queue: 5 issues (mix of low, medium, high difficulty) - Run autonomous orchestrator - Verify all issues completed without manual intervention - Verify quality gates enforced for all commits - Verify context managed (compaction, rotation as needed) - Verify cost optimization (cheapest agents used) This validates all success metrics from the PoC plan. ## Context Estimate - Files to modify: 2 (e2e test file, validation report) - Implementation complexity: medium (20,000 tokens) - Test requirements: high (15,000 tokens) - Documentation: heavy (5,000 tokens) - **Total estimated: 58,500 tokens** - **Recommended agent: glm** ## Difficulty medium ## Dependencies - Blocked by: #161 (COORD-012) ## Acceptance Criteria - [ ] E2E test completes all 5 issues autonomously - [ ] Zero manual interventions required - [ ] All quality gates pass before issue completion - [ ] Context never exceeds 95% (rotation triggered if needed) - [ ] Cost optimized (>70% on free models if applicable) - [ ] Success metrics report validates all targets - [ ] Tests pass (85% coverage minimum) ## Testing Requirements - Create 5 test issues (1 high, 2 medium, 2 low difficulty) - Execute full orchestration loop - Measure autonomy (count interventions) - Measure quality (gate pass rate) - Measure cost optimization (agent assignment) - Measure context management (exhaustion events) - Generate validation report - Coverage: 85% minimum ## Success Metrics Validation - Autonomy: 100% completion without human intervention - Quality: 100% of commits pass quality gates - Cost optimization: >70% issues use free models - Context management: 0 agents exceed 95% without rotation - Estimation accuracy: Within ±20% of actual usage
jason.woltje added the apiapip0phase-4 labels 2026-01-31 21:05:42 +00:00
jason.woltje added this to the M4.1-Coordinator (0.0.4) milestone 2026-01-31 21:10:04 +00:00
Sign in to join this conversation.
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: mosaic/stack#153