# Mission Scratchpad — PRD implementation > Append-only log. NEVER delete entries. NEVER overwrite sections. > This is the orchestrator's working memory across sessions. ## Original Mission Prompt ``` Active mission detected: PRD implementation. Read the mission state files and report status. User instruction: start planning. Be complete and thorough. ``` ## Planning Decisions ### 2026-02-22 — Task Breakdown **Decision**: Combined MS16 (Pages) and MS17 (Backend Integration) into a single milestone because 19 backend API modules with 42 controllers already exist. Work is primarily frontend page creation and API wiring. **Task structure**: 15 tasks across 4 phases: - Phase 1 (Foundation): 404 page + Settings root — quick wins to fill navigation gaps - Phase 2 (Mock Elimination): Wire tasks/calendar/knowledge to real APIs - Phase 3 (New Pages): Projects, Workspace, Kanban, File Manager, Logs, Profile — the bulk of new work - Phase 4 (Verification): Theme/responsive check, docs, deploy + smoke test **Branch strategy**: One feature branch per task, PR to main, squash merge. **Dependency rationale**: - PG-PAGE-002 (Workspace) depends on PG-PAGE-001 (Projects) — workspace shows single project detail, needs project list/selection pattern established first - PG-PAGE-003 (Kanban) depends on PG-API-001 (Tasks API wiring) — Kanban needs the tasks API client to be working with real data before building the board UI - Phase 4 tasks are sequential: verification → docs → deploy **Codebase findings** (from exploration): - TaskStatus enum: NOT_STARTED, IN_PROGRESS, PAUSED, COMPLETED, ARCHIVED (5 Kanban columns) - Mock data locations: `apps/web/src/lib/api/tasks.ts`, `events.ts`, `knowledge.ts`, `client.ts` - API client pattern: `apiGet()`, `apiPost()`, etc. with CSRF + workspace headers - 17 shared UI components in packages/ui (Button, Card, Badge, Input, Modal, DataTable, etc.) - Sidebar nav defined in `apps/web/src/components/layout/AppSidebar.tsx` — all links already point to correct routes - Design tokens in `apps/web/src/app/globals.css` with full light/dark support **Estimate**: ~320K tokens total across all tasks. **Issues created**: #466 (Phase 1), #467 (Phase 2), #468 (Phase 3), #469 (Phase 4) **Milestone**: MS16+MS17-PagesDataIntegration (Gitea) ### Profile Page Addition **Decision**: Added PG-PAGE-006 (Profile page) — PRD FR-003 notes "profile page navigation pending (MS16)" and the sidebar user card should link to it. Included in Phase 3. ## Session Log | Session | Date | Milestone | Tasks Done | Outcome | | ------- | ---------- | --------- | ------------------------ | ---------------------------------------------------------------------------------------------------- | | S1 | 2026-02-22 | MS16+MS17 | PG-PLAN-001 | Planning complete — milestone created, 4 issues created (#466-#469), 15 tasks populated in TASKS.md | | S1 | 2026-02-22 | MS16+MS17 | PG-FND-001 to PG-VER-001 | 13 implementation tasks completed. PRs #470-#483 merged. 3 test failures fixed. All 5125 tests pass. | | S2 | 2026-02-22 | MS16+MS17 | PG-DOC-001 | Documentation updates — PRD statuses, manifest, scratchpad, TASKS.md. | ## Open Questions (Resolved) 1. **Kanban DnD library**: RESOLVED — @hello-pangea/dnd selected (maintained fork of react-beautiful-dnd, better TS support) 2. **Workspace page default view**: RESOLVED — Shows project selector when no project param, workspace detail when ?project=id 3. **File Manager vs Knowledge**: RESOLVED — File Manager maps directly to Knowledge entries via /api/knowledge. API shape matches UI needs. ## Execution Summary ### PRs Merged (14 total) | PR | Task | Description | | ---- | ----------- | ---------------------------------------------------------- | | #470 | PG-PLAN-001 | Planning artifacts (TASKS.md, manifest, scratchpad) | | #471 | PG-FND-002 | Settings root page — 4 category cards | | #472 | PG-FND-001 | Custom 404 pages (global + authenticated) | | #473 | PG-API-001 | Tasks page wired to real API | | #474 | PG-API-002 | Calendar page wired to real API | | #475 | PG-API-001 | Tasks API updateTask function | | #476 | PG-API-003 | Knowledge pages wired to real API (238 lines mock removed) | | #477 | PG-PAGE-001 | Projects list page (809 lines) | | #478 | PG-PAGE-003 | Kanban board with DnD | | #479 | PG-PAGE-002 | Project workspace with tabs | | #480 | PG-PAGE-005 | Logs & telemetry page | | #481 | PG-PAGE-004 | File manager page | | #482 | PG-PAGE-006 | Profile page | | #483 | PG-VER-001 | Test fixes (3 failures resolved, 5125 pass) | ### Issues Closed - #466 (Phase 1: Foundation pages) - #467 (Phase 2: Mock elimination) - #468 (Phase 3: New pages) - #469 — pending closure after deploy ## Deployment Blocker — 2026-02-23 **Issue**: Traefik proxy does not route HTTPS to the API container (`api.mosaic.woltje.com`) after service restart. **Observed behavior**: - HTTP (port 80) works for both `mosaic.woltje.com` and `api.mosaic.woltje.com` (301 redirect) - HTTPS to `mosaic.woltje.com` (web) returns 200 — pages render - HTTPS to `api.mosaic.woltje.com` (API) hangs after TLS handshake — zero bytes received - Issue persists through multiple stop/start/restart cycles - Same behavior from external IP and from direct connection to 10.1.1.44 - All containers healthy internally (Coolify reports `running:healthy`) - Docker labels for Traefik routing are correct (verified via API) - Go-Live MVP deployment (pre-restart) had both working **What IS verified**: - CI pipeline #585 green (lint, typecheck, test, build, docker, trivy) - Web container serving latest code — all 10 new page routes return HTTP 200 - 404 page renders correctly ("Page Not Found", "Go to Dashboard") - API container healthy (health endpoint works internally) - All 15 PRs merged to main (#470-#484) **What is NOT verified** (requires API access from browser): - Auth flow (login via Authentik) - Pages rendering with real API data in browser - No console errors during navigation **Root cause**: Likely Traefik cert store or internal routing table corruption after container restart. Requires server-level access to inspect Traefik logs (`docker logs coolify-proxy`). **Resolution needed**: Jason to check Traefik proxy logs on Coolify server (10.1.1.44). May need Traefik proxy restart or cert store cleanup. ## Mission Close-Out — 2026-02-23 **Smoke test**: CONFIRMED by Jason. All pages accessible, auth working, no console errors. **Deployment blocker resolution**: Traefik HTTPS routing issue resolved (was intermittent proxy state issue). **Close-out actions (S3)**: - PRD updated: MS16+MS17 added to Completed Work, acceptance criteria 14-28 marked DONE, risks/open questions marked RESOLVED - Issue #469 closed with completion comment - Manifest updated with S2+S3 session entries - Mission status: **COMPLETE** **Final evidence**: - 15/15 tasks done - 15 PRs merged (#470-#484) - 4 issues closed (#466-#469) - CI pipeline #585 green - All 5125 tests passing - Deployed and smoke-tested at mosaic.woltje.com ## Corrections (none)