# Mission Scratchpad — Mosaic Stack Go-Live MVP > Append-only log. NEVER delete entries. NEVER overwrite sections. > This is the orchestrator's working memory across sessions. ## Original Mission Prompt ``` Continue Mosaic Stack Go-Live MVP from existing state. - Mission: Ship Mosaic Stack MVP: operational dashboard with theming, task ingestion, one visible agent cycle, deployed and smoke-tested. - 4 milestones: Dashboard Polish+Theming, Task Ingestion Pipeline, Agent Cycle Visibility, Deploy+Smoke Test - Prior work: MS15-DashboardShell complete (PRs #451-454) - Design ref: mosaic-stack-website/docs/designs/round-5/claude/01/dashboard.html ``` ## Planning Decisions ### 2026-02-22: Phase-1 Task Breakdown Baseline assessment: - Lint: PASS, Typecheck: PASS, Tests: FAIL (9 failures) - UI Button.test.tsx: 4 fails (old Tailwind class assertions vs new CSS token Button) - Web page.test.tsx: 5 fails (old widget layout vs Phase 3 rebuild) - Design system + theming already substantially complete from MS15 - 5 live widgets all use mock data (real data integration is phase-2) - 4 legacy widgets unused (hardcoded light theme, pre-Phase 3) Tasks created: MS-P1-001 through MS-P1-004, issue #457, milestone Go-Live-MVP-Phase1 (0.0.16) Estimated total: ~50K tokens ## Session Log | Session | Date | Milestone | Tasks Done | Outcome | | ------- | ---------- | --------- | ---------- | ------------------------------------------------------ | | S1 | 2026-02-22 | phase-1 | 4/4 | COMPLETE — PR #458 merged (07f5225), issue #457 closed | ### 2026-02-23: Phase-1 Completion Summary - PR #458 merged to main (squash), commit 07f5225 - Issue #457 closed - 4/4 tasks done, all quality gates green - Pre-existing bug noted: Toast.tsx var(--info) undefined (not in scope) - Net: -373 lines (legacy cleanup + responsive CSS additions) - Review: approve (0 blockers, 0 critical security) ### 2026-02-23: Phase-2 Completion Summary - PR #460 merged to main (squash), commit 7581d26 - Issue #459 closed - 3/3 tasks done (MS-P2-001 through MS-P2-003) - New files: dashboard module (controller, service, DTOs, tests), API client, typed widget props - Review blockers fixed: race condition (null workspaceId guard), TypeScript strict typing, error state UI - Net: +1042 lines, -253 lines (18 files changed) - All quality gates green: lint 8/8, typecheck 7/7, test 8/8 (no cache) | Session | Date | Milestone | Tasks Done | Outcome | | ------- | ---------- | --------- | ---------- | ------------------------------------------------------ | | S2 | 2026-02-23 | phase-2 | 3/3 | COMPLETE — PR #460 merged (7581d26), issue #459 closed | ### 2026-02-23: Phase-3 Completion Summary - PR #462 merged to main (squash), commit 458cac7 - Issue #461 closed - 3/3 tasks done (MS-P3-001 through MS-P3-003) - WebSocket emits wired into RunnerJobsService (create/cancel/retry/updateStatus/updateProgress) - Dashboard polling at 30s interval + OrchestratorSessions progress bars + step status labels - Review: approve (0 critical, 2 important fixed: stale-data guard, enum consistency) - All quality gates green: lint 8/8, typecheck 7/7, test 8/8 (no cache) | Session | Date | Milestone | Tasks Done | Outcome | | ------- | ---------- | --------- | ---------- | ------------------------------------------------------ | | S2 cont | 2026-02-23 | phase-3 | 3/3 | COMPLETE — PR #462 merged (458cac7), issue #461 closed | ### 2026-02-23: Phase-4 Completion Summary - 3/3 tasks done (MS-P4-001 through MS-P4-003) - Built stack-api and stack-web Docker images locally, pushed to git.mosaicstack.dev/mosaic/ registry - Fixed root route redirect: removed app/page.tsx that was intercepting / and redirecting to /tasks - Coolify service stop+start cycle required (restart alone caused flaky proxy routing) - Proxy routing note: Traefik route propagation takes ~5min after service restart; multiple rapid cycles cause intermittent 504s - Smoke test results: web HTTP 200 (0.19s), API health HTTP 200 (0.10s), dashboard API HTTP 401 (auth required) - Dashboard verified in browser: all 6 widgets rendering, auth working (User: Jarvis), dark/light theme toggle - All quality gates green: lint 8/8, typecheck 7/7, test 8/8 - Screenshot saved: docs/scratchpads/smoke-test-dashboard.png | Session | Date | Milestone | Tasks Done | Outcome | | ------- | ---------- | --------- | ---------- | ----------------------- | | S3 | 2026-02-23 | phase-4 | 3/3 | COMPLETE — mission done | ### Mission Summary - 4 milestones, 16 tasks, 4 PRs (#458, #460, #462, + phase-4 PR), 4 issues (#457, #459, #461, #463) - Success criteria met: dashboard at mosaic.woltje.com, task ingestion API, agent cycle visibility, deployed + smoke-tested - Known infra issue: Coolify proxy routing is flaky after rapid restart cycles; needs 5min stabilization ## Open Questions ## Corrections