Co-authored-by: Jason Woltje <jason@diversecanvas.com> Co-committed-by: Jason Woltje <jason@diversecanvas.com>
1.6 KiB
1.6 KiB
Mission Scratchpad — Mosaic Stack Go-Live MVP
Append-only log. NEVER delete entries. NEVER overwrite sections. This is the orchestrator's working memory across sessions.
Original Mission Prompt
Continue Mosaic Stack Go-Live MVP from existing state.
- Mission: Ship Mosaic Stack MVP: operational dashboard with theming, task ingestion,
one visible agent cycle, deployed and smoke-tested.
- 4 milestones: Dashboard Polish+Theming, Task Ingestion Pipeline,
Agent Cycle Visibility, Deploy+Smoke Test
- Prior work: MS15-DashboardShell complete (PRs #451-454)
- Design ref: mosaic-stack-website/docs/designs/round-5/claude/01/dashboard.html
Planning Decisions
2026-02-22: Phase-1 Task Breakdown
Baseline assessment:
- Lint: PASS, Typecheck: PASS, Tests: FAIL (9 failures)
- UI Button.test.tsx: 4 fails (old Tailwind class assertions vs new CSS token Button)
- Web page.test.tsx: 5 fails (old widget layout vs Phase 3 rebuild)
- Design system + theming already substantially complete from MS15
- 5 live widgets all use mock data (real data integration is phase-2)
- 4 legacy widgets unused (hardcoded light theme, pre-Phase 3)
Tasks created: MS-P1-001 through MS-P1-004, issue #457, milestone Go-Live-MVP-Phase1 (0.0.16) Estimated total: ~50K tokens
Session Log
| Session | Date | Milestone | Tasks Done | Outcome |
|---|---|---|---|---|
| S1 | 2026-02-22 | phase-1 | 0/4 | In progress — bootstrap complete, executing |