Files
stack/docs/scratchpads/prd-implementation-20260222.md
Jason Woltje 3d78b09064
All checks were successful
ci/woodpecker/push/web Pipeline was successful
docs: close out MS16+MS17 mission (#486)
Co-authored-by: Jason Woltje <jason@diversecanvas.com>
Co-committed-by: Jason Woltje <jason@diversecanvas.com>
2026-02-23 13:27:22 +00:00

7.5 KiB

Mission Scratchpad — PRD implementation

Append-only log. NEVER delete entries. NEVER overwrite sections. This is the orchestrator's working memory across sessions.

Original Mission Prompt

Active mission detected: PRD implementation. Read the mission state files and report status.
User instruction: start planning. Be complete and thorough.

Planning Decisions

2026-02-22 — Task Breakdown

Decision: Combined MS16 (Pages) and MS17 (Backend Integration) into a single milestone because 19 backend API modules with 42 controllers already exist. Work is primarily frontend page creation and API wiring.

Task structure: 15 tasks across 4 phases:

  • Phase 1 (Foundation): 404 page + Settings root — quick wins to fill navigation gaps
  • Phase 2 (Mock Elimination): Wire tasks/calendar/knowledge to real APIs
  • Phase 3 (New Pages): Projects, Workspace, Kanban, File Manager, Logs, Profile — the bulk of new work
  • Phase 4 (Verification): Theme/responsive check, docs, deploy + smoke test

Branch strategy: One feature branch per task, PR to main, squash merge.

Dependency rationale:

  • PG-PAGE-002 (Workspace) depends on PG-PAGE-001 (Projects) — workspace shows single project detail, needs project list/selection pattern established first
  • PG-PAGE-003 (Kanban) depends on PG-API-001 (Tasks API wiring) — Kanban needs the tasks API client to be working with real data before building the board UI
  • Phase 4 tasks are sequential: verification → docs → deploy

Codebase findings (from exploration):

  • TaskStatus enum: NOT_STARTED, IN_PROGRESS, PAUSED, COMPLETED, ARCHIVED (5 Kanban columns)
  • Mock data locations: apps/web/src/lib/api/tasks.ts, events.ts, knowledge.ts, client.ts
  • API client pattern: apiGet<T>(), apiPost<T>(), etc. with CSRF + workspace headers
  • 17 shared UI components in packages/ui (Button, Card, Badge, Input, Modal, DataTable, etc.)
  • Sidebar nav defined in apps/web/src/components/layout/AppSidebar.tsx — all links already point to correct routes
  • Design tokens in apps/web/src/app/globals.css with full light/dark support

Estimate: ~320K tokens total across all tasks.

Issues created: #466 (Phase 1), #467 (Phase 2), #468 (Phase 3), #469 (Phase 4) Milestone: MS16+MS17-PagesDataIntegration (Gitea)

Profile Page Addition

Decision: Added PG-PAGE-006 (Profile page) — PRD FR-003 notes "profile page navigation pending (MS16)" and the sidebar user card should link to it. Included in Phase 3.

Session Log

Session Date Milestone Tasks Done Outcome
S1 2026-02-22 MS16+MS17 PG-PLAN-001 Planning complete — milestone created, 4 issues created (#466-#469), 15 tasks populated in TASKS.md
S1 2026-02-22 MS16+MS17 PG-FND-001 to PG-VER-001 13 implementation tasks completed. PRs #470-#483 merged. 3 test failures fixed. All 5125 tests pass.
S2 2026-02-22 MS16+MS17 PG-DOC-001 Documentation updates — PRD statuses, manifest, scratchpad, TASKS.md.

Open Questions (Resolved)

  1. Kanban DnD library: RESOLVED — @hello-pangea/dnd selected (maintained fork of react-beautiful-dnd, better TS support)
  2. Workspace page default view: RESOLVED — Shows project selector when no project param, workspace detail when ?project=id
  3. File Manager vs Knowledge: RESOLVED — File Manager maps directly to Knowledge entries via /api/knowledge. API shape matches UI needs.

Execution Summary

PRs Merged (14 total)

PR Task Description
#470 PG-PLAN-001 Planning artifacts (TASKS.md, manifest, scratchpad)
#471 PG-FND-002 Settings root page — 4 category cards
#472 PG-FND-001 Custom 404 pages (global + authenticated)
#473 PG-API-001 Tasks page wired to real API
#474 PG-API-002 Calendar page wired to real API
#475 PG-API-001 Tasks API updateTask function
#476 PG-API-003 Knowledge pages wired to real API (238 lines mock removed)
#477 PG-PAGE-001 Projects list page (809 lines)
#478 PG-PAGE-003 Kanban board with DnD
#479 PG-PAGE-002 Project workspace with tabs
#480 PG-PAGE-005 Logs & telemetry page
#481 PG-PAGE-004 File manager page
#482 PG-PAGE-006 Profile page
#483 PG-VER-001 Test fixes (3 failures resolved, 5125 pass)

Issues Closed

  • #466 (Phase 1: Foundation pages)
  • #467 (Phase 2: Mock elimination)
  • #468 (Phase 3: New pages)
  • #469 — pending closure after deploy

Deployment Blocker — 2026-02-23

Issue: Traefik proxy does not route HTTPS to the API container (api.mosaic.woltje.com) after service restart.

Observed behavior:

  • HTTP (port 80) works for both mosaic.woltje.com and api.mosaic.woltje.com (301 redirect)
  • HTTPS to mosaic.woltje.com (web) returns 200 — pages render
  • HTTPS to api.mosaic.woltje.com (API) hangs after TLS handshake — zero bytes received
  • Issue persists through multiple stop/start/restart cycles
  • Same behavior from external IP and from direct connection to 10.1.1.44
  • All containers healthy internally (Coolify reports running:healthy)
  • Docker labels for Traefik routing are correct (verified via API)
  • Go-Live MVP deployment (pre-restart) had both working

What IS verified:

  • CI pipeline #585 green (lint, typecheck, test, build, docker, trivy)
  • Web container serving latest code — all 10 new page routes return HTTP 200
  • 404 page renders correctly ("Page Not Found", "Go to Dashboard")
  • API container healthy (health endpoint works internally)
  • All 15 PRs merged to main (#470-#484)

What is NOT verified (requires API access from browser):

  • Auth flow (login via Authentik)
  • Pages rendering with real API data in browser
  • No console errors during navigation

Root cause: Likely Traefik cert store or internal routing table corruption after container restart. Requires server-level access to inspect Traefik logs (docker logs coolify-proxy).

Resolution needed: Jason to check Traefik proxy logs on Coolify server (10.1.1.44). May need Traefik proxy restart or cert store cleanup.

Mission Close-Out — 2026-02-23

Smoke test: CONFIRMED by Jason. All pages accessible, auth working, no console errors.

Deployment blocker resolution: Traefik HTTPS routing issue resolved (was intermittent proxy state issue).

Close-out actions (S3):

  • PRD updated: MS16+MS17 added to Completed Work, acceptance criteria 14-28 marked DONE, risks/open questions marked RESOLVED
  • Issue #469 closed with completion comment
  • Manifest updated with S2+S3 session entries
  • Mission status: COMPLETE

Final evidence:

  • 15/15 tasks done
  • 15 PRs merged (#470-#484)
  • 4 issues closed (#466-#469)
  • CI pipeline #585 green
  • All 5125 tests passing
  • Deployed and smoke-tested at mosaic.woltje.com

Corrections

(none)