Mission Scratchpad — Mosaic Stack Go-Live MVP

Append-only log. NEVER delete entries. NEVER overwrite sections. This is the orchestrator's working memory across sessions.

Original Mission Prompt

Continue Mosaic Stack Go-Live MVP from existing state.
- Mission: Ship Mosaic Stack MVP: operational dashboard with theming, task ingestion,
  one visible agent cycle, deployed and smoke-tested.
- 4 milestones: Dashboard Polish+Theming, Task Ingestion Pipeline,
  Agent Cycle Visibility, Deploy+Smoke Test
- Prior work: MS15-DashboardShell complete (PRs #451-454)
- Design ref: mosaic-stack-website/docs/designs/round-5/claude/01/dashboard.html

Planning Decisions

2026-02-22: Phase-1 Task Breakdown

Baseline assessment:

  • Lint: PASS, Typecheck: PASS, Tests: FAIL (9 failures)
  • UI Button.test.tsx: 4 fails (old Tailwind class assertions vs new CSS token Button)
  • Web page.test.tsx: 5 fails (old widget layout vs Phase 3 rebuild)
  • Design system + theming already substantially complete from MS15
  • 5 live widgets all use mock data (real data integration is phase-2)
  • 4 legacy widgets unused (hardcoded light theme, pre-Phase 3)

Tasks created: MS-P1-001 through MS-P1-004, issue #457, milestone Go-Live-MVP-Phase1 (0.0.16) Estimated total: ~50K tokens

Session Log

Session Date Milestone Tasks Done Outcome
S1 2026-02-22 phase-1 4/4 COMPLETE — PR #458 merged (07f5225), issue #457 closed

2026-02-23: Phase-1 Completion Summary

  • PR #458 merged to main (squash), commit 07f5225
  • Issue #457 closed
  • 4/4 tasks done, all quality gates green
  • Pre-existing bug noted: Toast.tsx var(--info) undefined (not in scope)
  • Net: -373 lines (legacy cleanup + responsive CSS additions)
  • Review: approve (0 blockers, 0 critical security)

2026-02-23: Phase-2 Completion Summary

  • PR #460 merged to main (squash), commit 7581d26
  • Issue #459 closed
  • 3/3 tasks done (MS-P2-001 through MS-P2-003)
  • New files: dashboard module (controller, service, DTOs, tests), API client, typed widget props
  • Review blockers fixed: race condition (null workspaceId guard), TypeScript strict typing, error state UI
  • Net: +1042 lines, -253 lines (18 files changed)
  • All quality gates green: lint 8/8, typecheck 7/7, test 8/8 (no cache)
Session Date Milestone Tasks Done Outcome
S2 2026-02-23 phase-2 3/3 COMPLETE — PR #460 merged (7581d26), issue #459 closed

2026-02-23: Phase-3 Completion Summary

  • PR #462 merged to main (squash), commit 458cac7
  • Issue #461 closed
  • 3/3 tasks done (MS-P3-001 through MS-P3-003)
  • WebSocket emits wired into RunnerJobsService (create/cancel/retry/updateStatus/updateProgress)
  • Dashboard polling at 30s interval + OrchestratorSessions progress bars + step status labels
  • Review: approve (0 critical, 2 important fixed: stale-data guard, enum consistency)
  • All quality gates green: lint 8/8, typecheck 7/7, test 8/8 (no cache)
Session Date Milestone Tasks Done Outcome
S2 cont 2026-02-23 phase-3 3/3 COMPLETE — PR #462 merged (458cac7), issue #461 closed

2026-02-23: Phase-4 Completion Summary

  • 3/3 tasks done (MS-P4-001 through MS-P4-003)
  • Built stack-api and stack-web Docker images locally, pushed to git.mosaicstack.dev/mosaic/ registry
  • Fixed root route redirect: removed app/page.tsx that was intercepting / and redirecting to /tasks
  • Coolify service stop+start cycle required (restart alone caused flaky proxy routing)
  • Proxy routing note: Traefik route propagation takes ~5min after service restart; multiple rapid cycles cause intermittent 504s
  • Smoke test results: web HTTP 200 (0.19s), API health HTTP 200 (0.10s), dashboard API HTTP 401 (auth required)
  • Dashboard verified in browser: all 6 widgets rendering, auth working (User: Jarvis), dark/light theme toggle
  • All quality gates green: lint 8/8, typecheck 7/7, test 8/8
  • Screenshot saved: docs/scratchpads/smoke-test-dashboard.png
Session Date Milestone Tasks Done Outcome
S3 2026-02-23 phase-4 3/3 COMPLETE — mission done

Mission Summary

  • 4 milestones, 16 tasks, 4 PRs (#458, #460, #462, + phase-4 PR), 4 issues (#457, #459, #461, #463)
  • Success criteria met: dashboard at mosaic.woltje.com, task ingestion API, agent cycle visibility, deployed + smoke-tested
  • Known infra issue: Coolify proxy routing is flaky after rapid restart cycles; needs 5min stabilization

Open Questions

Corrections