Mission Scratchpad — Mosaic Stack Go-Live MVP

Append-only log. NEVER delete entries. NEVER overwrite sections. This is the orchestrator's working memory across sessions.

Original Mission Prompt

Continue Mosaic Stack Go-Live MVP from existing state.
- Mission: Ship Mosaic Stack MVP: operational dashboard with theming, task ingestion,
  one visible agent cycle, deployed and smoke-tested.
- 4 milestones: Dashboard Polish+Theming, Task Ingestion Pipeline,
  Agent Cycle Visibility, Deploy+Smoke Test
- Prior work: MS15-DashboardShell complete (PRs #451-454)
- Design ref: mosaic-stack-website/docs/designs/round-5/claude/01/dashboard.html

Planning Decisions

2026-02-22: Phase-1 Task Breakdown

Baseline assessment:

  • Lint: PASS, Typecheck: PASS, Tests: FAIL (9 failures)
  • UI Button.test.tsx: 4 fails (old Tailwind class assertions vs new CSS token Button)
  • Web page.test.tsx: 5 fails (old widget layout vs Phase 3 rebuild)
  • Design system + theming already substantially complete from MS15
  • 5 live widgets all use mock data (real data integration is phase-2)
  • 4 legacy widgets unused (hardcoded light theme, pre-Phase 3)

Tasks created: MS-P1-001 through MS-P1-004, issue #457, milestone Go-Live-MVP-Phase1 (0.0.16) Estimated total: ~50K tokens

Session Log

Session Date Milestone Tasks Done Outcome
S1 2026-02-22 phase-1 0/4 In progress — bootstrap complete, executing

Open Questions

Corrections