Co-authored-by: Jason Woltje <jason@diversecanvas.com> Co-committed-by: Jason Woltje <jason@diversecanvas.com>
3.4 KiB
Mission Scratchpad — PRD implementation
Append-only log. NEVER delete entries. NEVER overwrite sections. This is the orchestrator's working memory across sessions.
Original Mission Prompt
Active mission detected: PRD implementation. Read the mission state files and report status.
User instruction: start planning. Be complete and thorough.
Planning Decisions
2026-02-22 — Task Breakdown
Decision: Combined MS16 (Pages) and MS17 (Backend Integration) into a single milestone because 19 backend API modules with 42 controllers already exist. Work is primarily frontend page creation and API wiring.
Task structure: 15 tasks across 4 phases:
- Phase 1 (Foundation): 404 page + Settings root — quick wins to fill navigation gaps
- Phase 2 (Mock Elimination): Wire tasks/calendar/knowledge to real APIs
- Phase 3 (New Pages): Projects, Workspace, Kanban, File Manager, Logs, Profile — the bulk of new work
- Phase 4 (Verification): Theme/responsive check, docs, deploy + smoke test
Branch strategy: One feature branch per task, PR to main, squash merge.
Dependency rationale:
- PG-PAGE-002 (Workspace) depends on PG-PAGE-001 (Projects) — workspace shows single project detail, needs project list/selection pattern established first
- PG-PAGE-003 (Kanban) depends on PG-API-001 (Tasks API wiring) — Kanban needs the tasks API client to be working with real data before building the board UI
- Phase 4 tasks are sequential: verification → docs → deploy
Codebase findings (from exploration):
- TaskStatus enum: NOT_STARTED, IN_PROGRESS, PAUSED, COMPLETED, ARCHIVED (5 Kanban columns)
- Mock data locations:
apps/web/src/lib/api/tasks.ts,events.ts,knowledge.ts,client.ts - API client pattern:
apiGet<T>(),apiPost<T>(), etc. with CSRF + workspace headers - 17 shared UI components in packages/ui (Button, Card, Badge, Input, Modal, DataTable, etc.)
- Sidebar nav defined in
apps/web/src/components/layout/AppSidebar.tsx— all links already point to correct routes - Design tokens in
apps/web/src/app/globals.csswith full light/dark support
Estimate: ~320K tokens total across all tasks.
Issues created: #466 (Phase 1), #467 (Phase 2), #468 (Phase 3), #469 (Phase 4) Milestone: MS16+MS17-PagesDataIntegration (Gitea)
Profile Page Addition
Decision: Added PG-PAGE-006 (Profile page) — PRD FR-003 notes "profile page navigation pending (MS16)" and the sidebar user card should link to it. Included in Phase 3.
Session Log
| Session | Date | Milestone | Tasks Done | Outcome |
|---|---|---|---|---|
| S1 | 2026-02-22 | MS16+MS17 | PG-PLAN-001 | Planning complete — milestone created, 4 issues created (#466-#469), 15 tasks populated in TASKS.md |
Open Questions
- Kanban DnD library: dnd-kit vs react-beautiful-dnd vs @hello-pangea/dnd — worker should evaluate during implementation
- Workspace page default view: Should it require project selection or show a default? (PRD open question #5) — ASSUMPTION: Show project selection/list if no project context, else show project detail
- File Manager vs Knowledge: PRD ASSUMPTION #5 says File Manager maps to Knowledge entries — worker should confirm API shape matches UI needs
Corrections
(none yet)