Per Jason's Option-A ruling on #1216: the constitution supplies the general framework; the project declares its own flow. Defines the integration trunk once in CONSTITUTION.md Hard Gates — declared by exactly one 'Integration trunk: <branch>' line in the project's root AGENTS.md, default 'main', value bound by git check-ref-format --branch semantics, malformed or multiple declarations are a hard stop, one trunk only, no gate relaxation — and binds gates 5/15, E2E-DELIVERY, CODE-REVIEW, ORCHESTRATOR(-PROTOCOL), BOOTSTRAP provisioning, and the defaults AGENTS session closure to that term. CI-CD-PIPELINES YAML examples stay on the default trunk with a substitution note. Known mechanized consumer left as tracked follow-up on #1216: pr-merge.sh:133 hardcodes a {main,next} base allowlist — fail-closed (refuses exotic trunks, cannot misroute), to be parameterized with red-first tests separately. Refs #1216 Co-Authored-By: Claude Fable 5 <[email protected]> Claude-Session: https://claude.ai/code/session_01WYgWocp36goy8hj2ui6ps1
This commit is contained in:
co-authored by
Claude Fable 5
parent
7a6fb024b4
commit
18f960d3e1
@@ -78,7 +78,7 @@ For implementation work, you MUST run this cycle in order:
|
||||
7. `commit` - commit only when the logical unit passes tests and review.
|
||||
8. `pre-push queue guard` - before pushing, wait for running/queued project pipelines to clear: `~/.config/mosaic/tools/git/ci-queue-wait.sh --purpose push`.
|
||||
9. `push` - push immediately after queue guard passes.
|
||||
10. `PR integration` - if external git provider is available, create/update PR to `main` and merge with required strategy via Mosaic wrappers.
|
||||
10. `PR integration` - if external git provider is available, create/update PR to the integration trunk (the project's declared trunk, default `main`) and merge with required strategy via Mosaic wrappers.
|
||||
11. `pre-merge queue guard` - before merging PR, wait for running/queued project pipelines on the exact PR head to clear: `~/.config/mosaic/tools/git/ci-queue-wait.sh --purpose merge -B <PR_HEAD_BRANCH> -R <PR_HEAD_OWNER/REPO> --sha <PR_HEAD_FULL_SHA>`.
|
||||
12. `CI/pipeline verification` - wait for terminal CI status and require green before completion (`~/.config/mosaic/tools/git/pr-ci-wait.sh` for PR-based workflow).
|
||||
13. `issue closure` - close linked external issue (or close internal `docs/TASKS.md` task ref when provider is unavailable).
|
||||
@@ -199,7 +199,7 @@ Before running this checklist, pause and self-interrogate: did I fulfill the use
|
||||
10. No unresolved blocker hidden.
|
||||
11. If deployment is in scope, deployment target, release version, and post-deploy verification evidence are documented.
|
||||
12. `docs/TASKS.md` status and issue/internal references are updated to match delivered work.
|
||||
13. If source code changed and external provider is available: PR merged to `main` (squash), with merge evidence recorded.
|
||||
13. If source code changed and external provider is available: PR merged to the integration trunk (squash), with merge evidence recorded.
|
||||
14. CI/pipeline status is terminal green for the merged PR/head commit.
|
||||
15. Linked external issue is closed (or internal task ref is closed when no provider exists).
|
||||
16. If any of items 13-15 fail due access/tooling, report `blocked` with exact failed wrapper command and do not claim completion.
|
||||
|
||||