diff --git a/docs/compaction-refresh/governance/OWNER-WINDOW.md b/docs/compaction-refresh/governance/OWNER-WINDOW.md new file mode 100644 index 0000000..6660ad8 --- /dev/null +++ b/docs/compaction-refresh/governance/OWNER-WINDOW.md @@ -0,0 +1,34 @@ +# Gate0 Probe-3 Amendment — Owner Transparency Window (durable record) + +**Purpose.** Durable evidence (defined duration + closure) that the owner-transparency window on the +probe-3 amendment **scope-correction** has a bounded, inspectable lifecycle — per homelab's GATE-A +requirement (2026-07-18 18:13:14Z). This is NOT the owner's core authorization (that is durable in the +amendment §1); it is the objection-window on the narrowing disclosed afterward. + +## What was disclosed +The owner (Jason) explicitly authorized the amendment **class** — "amend the charter" (option B), +`#mos` 2026-07-18 17:28Z (amendment §1). My initial narrowing was "D4-only"; on adjudication that proved +non-executable (D4 intrinsically needs a promoted-to-VERIFIED baseline). The **corrected** scope +(rev 2, pin `9ac9ff87`, §3) adds a *minimal promotion-to-VERIFIED as a test fixture only* (P5/P6 still +excluded, P2 not banked as evidence). Because this adds a fixture step beyond the "D4-only" I first told +the owner, I disclosed the correction to him for transparency. + +## Window (bounded, durable) +- **Opened:** 2026-07-18T18:00:25Z — anchored to the adjudicator's Discord scope-correction disclosure to the + owner (message id `1528099140100296736`, snowflake-decoded; not an informal estimate). +- **Duration:** 2 hours (defined). +- **Scheduled closure:** 2026-07-18T20:00:25Z. +- **Closure condition (fail-closed):** + - No owner objection received by scheduled closure → window **CLOSED-CLEAR** (the disclosed correction + stands; it is within the already-granted class authorization). + - Any owner objection before closure → window does **NOT** clear → re-adjudicate the corrected scope. + - An affirmative owner "proceed" before closure → **early CLOSED-CLEAR** (recorded here). + +## Closure attestation +Closure will be confirmed by a dated adjudicator tick appended below (and to the orchestration ledger) +at/after 2026-07-18T20:00:25Z. Until that attestation exists, GATE A is OPEN and probe-3 execution stays HELD. + +- [ ] CLOSED-CLEAR attestation — to be recorded at/after 2026-07-18T20:00:25Z (or earlier on affirmative owner GO). + +*Adjudicator: Mos (`web1:mos-claude`). This record is durable and provider-inspectable alongside the +amendment (`9ac9ff87`) and its RATIFICATION.md.*