plans: D2 brief owner is sage (row 163, #1660), and D2 lands after the Part B window (mos-0958, mos-0959)
This commit is contained in:
@@ -280,7 +280,7 @@ shows only at start is found with the live stack stopped.
|
||||
|
||||
### Owner and reviewer
|
||||
|
||||
- Owner: set when the row is briefed.
|
||||
- Owner: sage (row 163, briefed 2026-10-20).
|
||||
- Reviewer: filbert.
|
||||
|
||||
### Files owned
|
||||
@@ -347,3 +347,8 @@ Mutants: one per behavior above.
|
||||
|
||||
As D1. D2 lands after D1, because both edit `stack-release.sh` and its
|
||||
test file.
|
||||
|
||||
D2 also lands after the Part B window (P19 385) has run. The Part B window
|
||||
file names the `stack-release.sh` blob, and any change to that blob means
|
||||
Mos checks the window again (mos-0958, mos-0959). The build and review can
|
||||
go ahead before then.
|
||||
|
||||