plans: D2 brief owner is sage (row 163, #1660), and D2 lands after the Part B window (mos-0958, mos-0959)

This commit is contained in:
2026-10-20 08:12:39 -05:00
parent 5487ed39d1
commit 6020bb43ac
+6 -1
View File
@@ -280,7 +280,7 @@ shows only at start is found with the live stack stopped.
### Owner and reviewer
- Owner: set when the row is briefed.
- Owner: sage (row 163, briefed 2026-10-20).
- Reviewer: filbert.
### Files owned
@@ -347,3 +347,8 @@ Mutants: one per behavior above.
As D1. D2 lands after D1, because both edit `stack-release.sh` and its
test file.
D2 also lands after the Part B window (P19 385) has run. The Part B window
file names the `stack-release.sh` blob, and any change to that blob means
Mos checks the window again (mos-0958, mos-0959). The build and review can
go ahead before then.