feat(fleet): add machine-readable NORTH_STAR.yaml + Markdown projection (#656)
This commit was merged in pull request #656.
This commit is contained in:
70
docs/fleet/NORTH_STAR.md
Normal file
70
docs/fleet/NORTH_STAR.md
Normal file
@@ -0,0 +1,70 @@
|
||||
# Mosaic Fleet — NORTH STAR
|
||||
|
||||
> **Generated file — do not edit by hand.**
|
||||
> Projected deterministically from [`NORTH_STAR.yaml`](./NORTH_STAR.yaml) by the pure
|
||||
> generator in `packages/mosaic/src/commands/fleet.ts` (`renderNorthStarMarkdown`).
|
||||
> Edit the YAML, then regenerate. Self-contained Mosaic — no Hermes dependency.
|
||||
|
||||
## Mission
|
||||
|
||||
A self-driving Mosaic delivery fleet that 24/7 unattended converts a machine-readable goal set into merged, CI-green, budget-bounded change — looping plan→backlog→assign→execute→verify→merge→reassess — on Mosaic's OWN native backlog/dispatch engine.
|
||||
|
||||
## Substrate
|
||||
|
||||
The Mosaic Backlog is the backlog of record + dispatch engine, built on Mosaic's native Postgres storage service (@mosaicstack/db drizzle; PGlite-embedded by default, full Postgres by config). NOT Hermes.
|
||||
|
||||
## Standing objectives
|
||||
|
||||
- **NS-1** — Single machine-readable source (this file) drives planning; prose docs are projections.
|
||||
- **NS-2** — Every backlog item is an independently-shippable unit with stable id, priority, depends_on DAG, represented as a Mosaic Backlog card; spend tracked as advisory projection.
|
||||
- **NS-3** — The supervisor guarantees movement: no idle agent while ready dependency-satisfied work exists; no empty backlog without a replan request; assignment via Mosaic native dispatch/claim.
|
||||
- **NS-4** — Exactly one merge-gate approver; nothing reaches main except via pr-merge.sh after pr-ci-wait.sh success; Gitea branch protection is the backstop.
|
||||
- **NS-5** — Every unit bounded by wall-clock TTL on its claim; token caps enforced only where a real meter exists, else advisory.
|
||||
- **NS-6** — Context cleared between tasks for ephemeral runners (reset_between_tasks); persona+mission re-injected per task.
|
||||
- **NS-7** — Meta-loop (session-review + enhancer) continuously proposes small fleet-improvement PRs.
|
||||
- **NS-8** — Single operator-flippable PAUSE kill-switch (fleet/run/PAUSED) honored before every dispatch and every merge.
|
||||
|
||||
## Success criteria
|
||||
|
||||
- **AC-NS-1** — The supervisor keeps a two-agent floor (1 orchestrator + >=1 enhancer) healthy across reboot.
|
||||
- **AC-NS-2** — A goal added to this YAML is decomposed to cards and either merged or escalated, with no human in the loop.
|
||||
- **AC-NS-3** — No PR merges with failure/error/no-status/timeout CI, and none bypass pr-merge.sh.
|
||||
- **AC-NS-4** — TTL is enforced on claims; token caps remain advisory until a real meter exists.
|
||||
- **AC-NS-5** — Flipping fleet/run/PAUSED halts dispatch and merges within one tick.
|
||||
|
||||
## Workstreams
|
||||
|
||||
| id | title |
|
||||
| --- | ---------------------------------------------------------------- |
|
||||
| A | Substrate — Mosaic Backlog on native Postgres storage service |
|
||||
| B | Supervisor — movement guarantee, two-agent floor, dispatch/claim |
|
||||
| C | Planner — goal decomposition into independently-shippable cards |
|
||||
| D | Merge-gate — single approver, pr-merge.sh after CI wait |
|
||||
| E | Meta-loop — session-review + enhancer improvement PRs |
|
||||
| F | Safety-rails — TTL claims, advisory spend, PAUSE kill-switch |
|
||||
|
||||
## Goals (backlog projection)
|
||||
|
||||
| id | title | phase | priority | depends_on |
|
||||
| --- | ---------------------------------------------------------------------- | ----- | ----------- | ---------- |
|
||||
| A1 | Machine-readable NORTH_STAR.yaml + Markdown projection | 1 | must-have | — |
|
||||
| A2 | Mosaic Backlog schema + storage-service card store (drizzle/PGlite) | 1 | must-have | A1 |
|
||||
| A3a | Card lifecycle — create/claim/release with stable ids + depends_on DAG | 1 | must-have | A2 |
|
||||
| A3b | TTL-bounded claim enforcement (wall-clock) on cards | 1 | must-have | A3a |
|
||||
| A4 | Advisory spend projection per card (degrades to TTL, no real meter) | 1 | should-have | A3a |
|
||||
| B1 | Supervisor tick — readiness scan, two-agent-floor health check | 2 | must-have | A3a |
|
||||
| B2 | Native dispatch/claim — assign ready dependency-satisfied work | 2 | must-have | A3b, B1 |
|
||||
| B3a | Planner decompose — goal added to YAML → cards | 2 | must-have | A2, B1 |
|
||||
| B3b | Replan request on empty backlog; escalate on no-decompose | 2 | should-have | B3a |
|
||||
| G1 | PAUSE kill-switch + merge-gate honored before dispatch and merge | 2 | must-have | B2 |
|
||||
|
||||
## Assumptions (vetoable)
|
||||
|
||||
- **ASM-1** (vetoable) — The Mosaic Backlog on the native Postgres storage service is the backlog of record.
|
||||
- **ASM-2** (vetoable) — Claude gate roles have no native busy status, so readiness = pane-idle + heartbeat.
|
||||
- **ASM-3** (vetoable) — Two-agent floor = 1 orchestrator + >=1 enhancer.
|
||||
|
||||
## Spend
|
||||
|
||||
- **advisory:** true
|
||||
- No per-task token meter yet; budgets degrade to TTL. Spend is tracked only as an advisory projection alongside each card.
|
||||
Reference in New Issue
Block a user