chore(orchestrator): complete Phase 5 milestone — v0.0.6
All checks were successful
ci/woodpecker/push/ci Pipeline was successful
All checks were successful
ci/woodpecker/push/ci Pipeline was successful
- P5-005 done: Telegram plugin wired, .env.example updated - PR #99 merged, issue #45 closed - Phase 5 complete, advancing to Phase 6 Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
This commit is contained in:
@@ -73,6 +73,19 @@ User confirmed: start the planning gate.
|
||||
| ------- | ---------- | --------- | ---------- | ----------------------------------------------------------------------------------- |
|
||||
| 7-8 | 2026-03-12 | Phase 2 | P2-007 | 19 unit tests (routing + coord). PR #79 merged, issue #25 closed. Phase 2 complete. |
|
||||
|
||||
### Session 11 — Phase 5 completion
|
||||
|
||||
| Session | Date | Milestone | Tasks Done | Outcome |
|
||||
| ------- | ---------- | --------- | ---------- | ----------------------------------------------------------------------------------------------------------------------------------------------- |
|
||||
| 11 | 2026-03-14 | Phase 5 | P5-005 | Wired Telegram plugin into gateway (was stubbed). Updated .env.example with all P5 env vars. PR #99 merged, issue #45 closed. Phase 5 complete. |
|
||||
|
||||
**Findings during verification:**
|
||||
|
||||
- Telegram plugin was built but not wired into gateway (stub warning in plugin.module.ts)
|
||||
- Discord plugin was fully wired
|
||||
- SSO/Authentik OIDC adapter was fully wired
|
||||
- All three quality gates passing
|
||||
|
||||
## Open Questions
|
||||
|
||||
(none at this time)
|
||||
|
||||
Reference in New Issue
Block a user