This commit is contained in:
+122
@@ -102,6 +102,128 @@ Context compaction, session replacement, and same-PID runtime reloads can leave
|
||||
|
||||
---
|
||||
|
||||
## Pi Persistent Goal Loop (#1150)
|
||||
|
||||
### Problem and objective
|
||||
|
||||
A Pi agent can stop after a plausible-looking answer even when the operator's broader objective is
|
||||
not complete, and ordinary compaction can weaken or omit the original objective. Mosaic needs an
|
||||
optional, operator-controlled goal loop that keeps a Pi session oriented, checks progress at native
|
||||
lifecycle boundaries, and resumes work until completion is verified or a bounded safety state is
|
||||
reached.
|
||||
|
||||
The objective is a Mosaic-owned Pi extension deployed from the framework into
|
||||
`~/.config/mosaic/runtime/pi/`. It must not install into or depend on `~/.pi/agent/extensions/`.
|
||||
|
||||
### Scope
|
||||
|
||||
#### In scope
|
||||
|
||||
1. `PGL-REQ-01`: The framework SHALL ship a dedicated Pi goal extension under
|
||||
`packages/mosaic/framework/runtime/pi/`, seed it under `$MOSAIC_HOME/runtime/pi/`, and make
|
||||
`mosaic pi` load it alongside the core Mosaic extension when present.
|
||||
2. `PGL-REQ-02`: `/goal` SHALL support setting a goal plus status, pause, resume, cancel, and help
|
||||
operations without silently replacing an active goal.
|
||||
3. `PGL-REQ-03`: Active branch-specific goal state SHALL be persisted in Pi custom session entries,
|
||||
restored on session start and tree navigation, and never rely on a compaction summary as its
|
||||
source of truth.
|
||||
4. `PGL-REQ-04`: A hidden goal contract SHALL be injected through Pi's `context` event before every
|
||||
model request so it remains effective across tool turns, retries, and post-compaction requests.
|
||||
5. `PGL-REQ-05`: The harness SHALL inspect every `turn_end` and successful `session_compact` event.
|
||||
A structured terminating goal-report tool SHALL capture `continue`, evidence-bearing `achieved`,
|
||||
or `blocked` status without requiring a redundant model turn.
|
||||
6. `PGL-REQ-06`: An achievement claim SHALL remain provisional until a second consecutive
|
||||
evidence-bearing verification report. Any continuation report or successful compaction during
|
||||
verification SHALL reset the verification sequence.
|
||||
7. `PGL-REQ-07`: Continuation SHALL be initiated at safe lifecycle boundaries, primarily
|
||||
`agent_settled`; manual compaction and restored active sessions may schedule a deferred idle
|
||||
continuation without re-entering compaction handlers.
|
||||
8. `PGL-REQ-08`: The loop SHALL have operator cancellation plus bounded turn and repeated-no-progress
|
||||
limits. Exhausted or blocked goals pause rather than continuing indefinitely.
|
||||
9. `PGL-REQ-09`: Framework installation and update SHALL preserve normal manifest ownership: the
|
||||
goal extension is framework-owned under `runtime/**`, while no goal extension or configuration
|
||||
asset is created or modified under the operator's main Pi configuration. Pi remains the owner of
|
||||
its native session files used by `appendEntry()`.
|
||||
|
||||
#### Out of scope
|
||||
|
||||
1. A mathematical guarantee that an arbitrary natural-language goal is semantically complete.
|
||||
2. Automatically executing user-supplied shell predicates or accepting executable validation code in
|
||||
`/goal` arguments.
|
||||
3. Restarting Pi after process, host, or supervisor failure; the existing Mosaic fleet/runtime
|
||||
supervisor owns process durability.
|
||||
4. Gateway, database, web UI, Discord, or cross-harness goal orchestration in this slice.
|
||||
|
||||
### User and stakeholder requirements
|
||||
|
||||
- An operator can start a goal from Pi and see its current phase, evidence, limits, and latest report.
|
||||
- The agent remains oriented after each turn and compaction until verified, paused, blocked,
|
||||
exhausted, or cancelled.
|
||||
- Local testing uses a file under `~/.config/mosaic/runtime/pi/`; the feature never writes an
|
||||
extension asset to `~/.pi/agent/extensions/`.
|
||||
- Framework updates deploy the same reviewed extension source through Mosaic's existing manifest
|
||||
sync path.
|
||||
|
||||
### Non-functional requirements
|
||||
|
||||
1. **Safety:** bounded continuation, explicit cancellation, no arbitrary command execution, and no
|
||||
completion without non-empty reported evidence.
|
||||
2. **Reliability:** serialized continuation scheduling, branch-aware restoration, compaction-safe
|
||||
context injection, and stale-timer cancellation on session shutdown.
|
||||
3. **Performance:** no extra nested judge-model request on every turn; structured reporting uses the
|
||||
active agent's final terminating tool call.
|
||||
4. **Observability:** Pi status/notifications expose phase and bounded counters without recording
|
||||
credentials or hidden model reasoning.
|
||||
5. **Maintainability:** the state machine is deterministic and behavior-tested independently from Pi
|
||||
provider/network access.
|
||||
|
||||
### Acceptance criteria
|
||||
|
||||
1. `AC-PGL-01`: A framework-sync fixture installs the extension at
|
||||
`$MOSAIC_HOME/runtime/pi/goal-extension.ts`, and launcher tests prove both Mosaic Pi extensions are
|
||||
emitted in deterministic order while absent optional files remain backward-compatible.
|
||||
2. `AC-PGL-02`: Command tests prove set/status/pause/resume/cancel behavior, active-goal replacement
|
||||
refusal, and bounded input handling.
|
||||
3. `AC-PGL-03`: Lifecycle tests prove every turn is recorded, active context is injected on every
|
||||
request, two evidence-bearing achievement reports are required, and `agent_settled` continues an
|
||||
unmet goal without duplicate scheduling.
|
||||
4. `AC-PGL-04`: Compaction and restoration tests prove goal state survives, verification is reset and
|
||||
rechecked after compaction, manual compaction continuation is deferred until idle, and tree/session
|
||||
branch state is reconstructed correctly.
|
||||
5. `AC-PGL-05`: Limit tests prove max-turn and repeated-no-progress exhaustion stop autonomous
|
||||
continuation, while pause/cancel/blocked states do not restart.
|
||||
6. `AC-PGL-06`: Focused tests, package typecheck/lint/test, repository quality gates, a local Pi load
|
||||
smoke test from `~/.config/mosaic/runtime/pi/`, independent review, and terminal-green CI pass before
|
||||
issue #1150 closes.
|
||||
|
||||
### Constraints, risks, and assumptions
|
||||
|
||||
- Dependency: Pi's extension API must continue to provide `registerCommand`, `registerTool`,
|
||||
`context`, `turn_end`, `agent_settled`, `session_compact`, session custom entries, and terminating
|
||||
tool results.
|
||||
- Risk: the working agent can overstate completion. Mitigation: structured evidence, a mandatory
|
||||
second verification pass, explicit semantic limitations, and operator-visible reports.
|
||||
- Risk: an impossible goal can consume unbounded resources. Mitigation: hard turn/no-progress bounds
|
||||
and paused terminal states.
|
||||
- Risk: automatic continuation can race compaction or session replacement. Mitigation: drive from
|
||||
`agent_settled`, defer idle restarts, generation-check timers, and clear timers on shutdown.
|
||||
- `ASSUMPTION:` Two consecutive evidence-bearing reports are the initial local verification policy;
|
||||
rationale: it provides a real recheck without doubling every turn's model cost. Future policy may
|
||||
add independent or deterministic validators.
|
||||
- `ASSUMPTION:` Default limits are 40 turns and 6 repeated no-progress reports, configurable only by
|
||||
bounded Mosaic environment settings; rationale: useful persistence with a finite autonomous budget.
|
||||
- `ASSUMPTION:` Documentation remains canonical in-repo for this slice; no external docs publication
|
||||
is requested.
|
||||
|
||||
### Testing and delivery intent
|
||||
|
||||
Use TDD for the deterministic controller and lifecycle invariants. Test with fake Pi lifecycle
|
||||
objects first, then run a local load/smoke test from the deployed Mosaic path. Deliver source, tests,
|
||||
launcher wiring, framework/runtime documentation, user/developer guides, and sitemap updates in one
|
||||
reviewed squash PR to `main` with terminal-green CI.
|
||||
|
||||
---
|
||||
|
||||
## Fleet Declarative Configuration Management Workstream (FCM, #758)
|
||||
|
||||
### Problem and objective
|
||||
|
||||
Reference in New Issue
Block a user