docs(chat-03): brief pinned at 1ef15ac0 after r3 and scope check, lead decision 33 (#1507)

Co-Authored-By: Claude Opus 5.5 <[email protected]>
This commit is contained in:
2026-09-26 19:45:04 -05:00
co-authored by Claude Opus 5.5
parent 93ee5054f4
commit 8a465e891a
18 changed files with 6822 additions and 1 deletions
+3
View File
@@ -428,3 +428,6 @@ are never rewritten or removed; corrections are new entries.
2026-09-27T00:38:30Z | Filbert (T3 Claude Code, thread 9cb9731e) | CHAT-03 brief R3 review (#1507 row 5), BRIEF 2c5be6b4, scoped by lead decisions 30 and 31 | approved on retained sections, no blocking finding; F1, F2 and R2 n1/n4 closed, n2/n3 moot (drift to CHAT-07); notes n1 pin executed bundle, n2 own-clear queue_update precedes response, n3 aborted with no stop, n4 decision-31 cut-pass list; review agents/filbert/work/chat-03-brief-review-r3-2026-09-27.md 48447592
2026-09-27T00:39:00Z | Sage (T3 Claude Code, thread 1ef1e4f8) | CHAT-03 r3 closed | Filbert r3 approve (48447592), Rocko blocker closed by decision 31. Lead decision 32: pin pi lockfile integrity (n1), O5 counts clear queue_update (n2); Dewey one edit, Filbert diff-only scope check, Sage pins.
2026-09-27T00:40:05Z | Sage (T3 Claude Code, thread 1ef1e4f8) | goals review ratified | Jason: "goals-review doc looks good". Page marked ratified, QUEUE priority line updated, AGENTS.md pointer to the north star added.
2026-09-27T00:42:33Z | Dewey (T3 Claude Code, thread 84fb346c) | CHAT-03 brief final edit (#1507 row 5), lead decision 32 | R3 frozen as BRIEF-r3-2c5be6b4.md; final BRIEF.md 1ef15ac0 (1451 lines, 0444) applies decision 30 cuts, decision 31 (no explicit extensions), n1 lock-integrity pin, n2 clear queue_update (O5, N25), Rocko fence build note; diff BRIEF-r3-to-final.diff c6bd1f1e sent to Filbert for scope check, then Sage pins. No commit or push.
2026-09-27T00:44:53Z | Filbert (T3 Claude Code, thread 9cb9731e) | CHAT-03 final scope check (lead decision 32): BRIEF.md 1ef15ac0 against r3 2c5be6b4, diff c6bd1f1e | PASS, all five items applied, nothing else in the diff; result sent to Sage, copy to Dewey; no commit or push
2026-09-27T00:45:04Z | Sage (T3 Claude Code, thread 1ef1e4f8) | CHAT-03 brief pinned | Filbert scope check PASS; BRIEF.md 1ef15ac0 committed with rounds and reviews; lead decision 33; QUEUE row 5. Source author after A2.
+10
View File
@@ -418,3 +418,13 @@ which stay with him. Each item names who decided it and what happened.
31 and 32, and add Rocko's fence note to the build. Filbert checks that
the diff only does that. That's a scope check, not a review round.
Then Sage pins the hash, and CHAT-03 is ready for a source author.
33. **CHAT-03 brief pinned.** Filbert's scope check passed. The final
`agents/dewey/work/chat-03/BRIEF.md` (sha256 1ef15ac0…, 1,451 lines,
down from 1,527) differs from r3 (2c5be6b4) only by items 30 to 32 and
what follows from them. Dewey's diff c6bd1f1e matched Filbert's own
regeneration. His two observations are accepted as written. The P3 rule
disables every Pi dialog, which is wider than CHAT-01, but no dialog can
reach the controller without explicit extensions. Sage committed the
brief, the earlier rounds and the six review reports. Sage names the
source author after queue A2 lands, so Darkwing isn't split between
them. The code may not start before then.
+2 -1
View File
@@ -42,7 +42,7 @@ which clears rows 9-13 to proceed; it does not authorize publication/access chan
| 2 | Seat registration and `mosaic seat task` | darkwing | #1504 | done 2026-09-13 | B passed 2026-09-12 | plan page, Step 3 |
| 3 | Reply-from-board (piece 2 on the plan page) | darkwing | #1505 | done 2026-09-12 | C passed 2026-09-12 | plan page, "Piece 2: reply-from-board" |
| 4 | Ledger (piece 3 on the plan page) | darkwing | #1506 | done 2026-09-13 | D: 18.9 human messages per closed issue, week of 2026-09-06 | plan page, "Piece 3: ledger" |
| 5 | WebUI first screen on the Console design (piece 4 on the plan page) | dewey; filbert reviews | #1507 | CHAT-00/01/01C contracts published (370823b3, 28d4e98a, b023841c); CHAT-02 done: backend a5beb6d9, Console c9e771cf, live check passed 2026-09-26; CHAT-03 chartered 2026-09-26 (Jason approved); after brief r3, source work waits for Sage to rescope against Gate E (lead decision 27), Dewey writes the brief, Filbert reviews, Rocko adversarial, source author named by Darkwing after brief approval; CHAT-04..08 not chartered; Gate E blocked | E: all-seat interactive demonstration then Jason workday ruling; live cutover separately approved | `2026-09-13_webui-session-chat.md`, CHAT-00..08 |
| 5 | WebUI first screen on the Console design (piece 4 on the plan page) | dewey; filbert reviews | #1507 | CHAT-00/01/01C contracts published (370823b3, 28d4e98a, b023841c); CHAT-02 done: backend a5beb6d9, Console c9e771cf, live check passed 2026-09-26; CHAT-03 brief approved and pinned 2026-09-27 (BRIEF.md 1ef15ac0, rescoped to Gate E, lead decisions 30 to 33; Filbert r3 approve, Rocko blocker closed, Filbert scope check pass); source author named by Sage after queue A2 lands; CHAT-04..08 not chartered; Gate E blocked | E: all-seat interactive demonstration then Jason workday ruling; live cutover separately approved | `2026-09-13_webui-session-chat.md`, CHAT-00..08 |
| 6 | Darkwing on point: darkwing assigns and gates filbert's work (piece 5 on the plan page) | darkwing; filbert authors pilot; darkwing/dewey review | #1511 code phase; #1512 pilot | done 2026-09-27 (Sage, lead decision 29): #1511 and #1512 landed in af4203ca (pushed) and are closed; Gate F not passed: the ledger counts 2 human messages in filbert's T3 thread during #1512 (one is Jason's 09-26 seat takeover) and its first 11 days predate the T3 source; Gate G (row 9) now carries the zero-human-message test | F: filbert's item closes with zero human messages from Jason; code phase does not claim Gate F | `2026-09-15_relaunch-activity.md`; `2026-09-14_task-attribution.md`; plan page Piece 5 |
| 7 | Weekly ledger run and rails number | sage (lead decision 27); Jason reads | — | recurring, every Monday; 09-13..19: 47.7, 09-20..26: 33.0 human messages per closed issue | under 10 human messages per closed issue for the week of 2026-09-13 | `packages/ledger/README.md` |
| 8 | Fleet seats (`~/.mosaic`) onto `mosaic launch` | unassigned | — | parked by current owner direction; no `~/.mosaic` changes during internal bootstrap | Jason's call | none yet |
@@ -146,3 +146,4 @@ Gate F or when blocked."
- 2026-09-27 — sage (lead): row 5 State: CHAT-03 source work waits after brief r3 for a rescope against Gate E. Row 7: Sage runs the ledger each Monday. Weeks 09-13..19 and 09-20..26 came to 47.7 and 33.0 human messages per closed issue, against a target under 10. See `docs/plans/2026-09-27_goals-review.md`, lead decision 27. No other row changed.
- 2026-09-27 — sage (lead): rows 1, 6, 23, 24 and 25 done (lead decision 29). #1503, #1509 and #1511 closed with evidence comments. Gate F recorded as not passed; Gate G carries its test. No other row changed.
- 2026-09-27 — sage (lead): priority line: Jason ratified the goals review (north star and goal order). No row changed.
- 2026-09-27 — sage (lead): row 5 State: CHAT-03 brief pinned at 1ef15ac0 after the scope check. Source author named after A2. No other row changed.