docs(plans): north star and goal order ratified by Jason, AGENTS.md pointer

Co-Authored-By: Claude Opus 5.5 <[email protected]>
This commit is contained in:
2026-09-26 19:40:05 -05:00
co-authored by Claude Opus 5.5
parent 77680e0b22
commit 93ee5054f4
4 changed files with 11 additions and 9 deletions
+1
View File
@@ -187,6 +187,7 @@ Full reference — usage, fields, exit codes, safety notes:
## Pointers (depth lives here)
- `docs/plans/2026-09-27_goals-review.md` — north star and goal order (Jason ratified 2026-09-27)
- `docs/plans/QUEUE.md` — THE task list (one row per piece; read first)
- `docs/plans/CURRENT.md` — narrative log behind the queue rows
- `docs/plans/ROADMAP.md` — agreed milestone path (M16+)
+1
View File
@@ -427,3 +427,4 @@ are never rewritten or removed; corrections are new entries.
2026-09-27T00:34:05Z | Sage (T3 Claude Code, thread 1ef1e4f8) | CHAT-03 r3 Rocko verdict | Rocko r3 (19e3fcff): one blocker, unpinned helper imports from explicit extensions. Lead decision 31: bound seats load no explicit extensions; extensions return with goal in CHAT-06 with pinned dependencies. Awaiting Filbert r3.
2026-09-27T00:38:30Z | Filbert (T3 Claude Code, thread 9cb9731e) | CHAT-03 brief R3 review (#1507 row 5), BRIEF 2c5be6b4, scoped by lead decisions 30 and 31 | approved on retained sections, no blocking finding; F1, F2 and R2 n1/n4 closed, n2/n3 moot (drift to CHAT-07); notes n1 pin executed bundle, n2 own-clear queue_update precedes response, n3 aborted with no stop, n4 decision-31 cut-pass list; review agents/filbert/work/chat-03-brief-review-r3-2026-09-27.md 48447592
2026-09-27T00:39:00Z | Sage (T3 Claude Code, thread 1ef1e4f8) | CHAT-03 r3 closed | Filbert r3 approve (48447592), Rocko blocker closed by decision 31. Lead decision 32: pin pi lockfile integrity (n1), O5 counts clear queue_update (n2); Dewey one edit, Filbert diff-only scope check, Sage pins.
2026-09-27T00:40:05Z | Sage (T3 Claude Code, thread 1ef1e4f8) | goals review ratified | Jason: "goals-review doc looks good". Page marked ratified, QUEUE priority line updated, AGENTS.md pointer to the north star added.
+7 -8
View File
@@ -1,8 +1,8 @@
# Goals review, 2026-09-27
Jason asked whether the north star and goals need a review. Sage's answer
is yes. This page gives the evidence, a proposed north star and goals, and
what changes now. Jason ratifies the north star, because it is his.
is yes. This page gives the evidence, the north star and goals, and
what changes now. Jason ratified the north star and goal order on 2026-09-27.
Everything else on this page is a lead decision (item 27) and is already
in effect.
@@ -37,7 +37,7 @@ The lead's own time also drifted. On 2026-09-26 a large share of Sage's
session went to a SetSpark service fix in another repository. It was
delegated and worth doing, but it isn't this project's goal.
## Proposed north star (Jason ratifies)
## North star (ratified 2026-09-27)
Jason states what he wants. The agents take it from request to a
verified, committed result on the new stack, and Jason isn't the
@@ -46,7 +46,7 @@ messenger between them.
The measure is the ledger: human messages per closed issue, and the
number of issues closed per week. Both are already computed.
## Proposed goals, in order
## Goals, in order
1. **Close what is open.** Finish before starting. Each open issue gets
either a closing piece or a written reason it stays open. The target is
@@ -76,8 +76,7 @@ number of issues closed per week. Both are already computed.
- **Weekly check.** Sage runs the ledger every Monday and records the
number in QUEUE row 7's log.
## What Jason decides
## Ratified
1. Ratify or rewrite the north star sentence.
2. Whether the goal order above matches the target he is preparing for
the next phase.
Jason ratified this page on 2026-09-27 ("goals-review doc looks good"):
the north star sentence and the goal order stand as written.
+2 -1
View File
@@ -29,7 +29,7 @@ Jason is preparing the target for the next phase; until it arrives, the
priority below stands.
Current priority: Sage's goal order from the 2026-09-27 goals review (close
what is open, queue as data, Gate E), pending Jason's ratification. Earlier: row 6, after Jason accepted row 18. His newer standing continuation instruction supplies the
what is open, queue as data, Gate E), ratified by Jason 2026-09-27. Earlier: row 6, after Jason accepted row 18. His newer standing continuation instruction supplies the
start; the earlier row-18-only priority is complete. Jason requires
automatic continuation to the next authorized item after each accepted iteration;
no routine next-step prompt. Explicit dependencies and protected-action gates remain. Use the five internal agents, not fleet seats. No
@@ -145,3 +145,4 @@ Gate F or when blocked."
- 2026-09-27 — sage (lead): rows 9 and 11 State: queue A1 committed (34a72af9) with the brief template; A2 in progress. No other row changed.
- 2026-09-27 — sage (lead): row 5 State: CHAT-03 source work waits after brief r3 for a rescope against Gate E. Row 7: Sage runs the ledger each Monday. Weeks 09-13..19 and 09-20..26 came to 47.7 and 33.0 human messages per closed issue, against a target under 10. See `docs/plans/2026-09-27_goals-review.md`, lead decision 27. No other row changed.
- 2026-09-27 — sage (lead): rows 1, 6, 23, 24 and 25 done (lead decision 29). #1503, #1509 and #1511 closed with evidence comments. Gate F recorded as not passed; Gate G carries its test. No other row changed.
- 2026-09-27 — sage (lead): priority line: Jason ratified the goals review (north star and goal order). No row changed.