merge: absorb main into next — 23-commit divergence (08-05..13 base=main window)
ci/woodpecker/pr/ci Pipeline failed

17 content commits + 3 merge bubbles were genuinely missing from next (~8,000 lines:
goal controller #1152, framework enforcement #1174/#1195, pr-edit wrapper #1173/#1200,
pipefail series #1100/#1105/#1106/#1107, git-tools fixes #1073/#1085/#1086/#1089,
#991, #1007, enrollment tolerance #1094). 3 commits were already in next by content
(#1060 identical, #1066/#1062 evolved twins — conflicts resolved to next's side).

Per-commit classification and evidence: mosaic-brain fleet/lanes/stack-remediation/main-next-divergence.md.
Conflict resolutions (6 files) itemized in the PR body.
This commit is contained in:
2026-08-19 16:27:17 -05:00
105 changed files with 7967 additions and 208 deletions
+55 -3
View File
@@ -8,9 +8,10 @@
4. [Tasks](#tasks)
5. [Settings](#settings)
6. [CLI Usage](#cli-usage)
7. [Sub-package Commands](#sub-package-commands)
8. [Telemetry](#telemetry)
9. [Local Fleet Canary](./fleet-local-canary.md)
7. [Pi Persistent Goals](#pi-persistent-goals)
8. [Sub-package Commands](#sub-package-commands)
9. [Telemetry](#telemetry)
10. [Local Fleet Canary](./fleet-local-canary.md)
---
@@ -317,6 +318,57 @@ mosaic prdy
mosaic quality-rails
```
## Pi Persistent Goals
`mosaic pi` loads a Mosaic-owned goal extension from
`~/.config/mosaic/runtime/pi/goal-extension.ts`. It is deliberately not installed in
`~/.pi/agent/extensions/`; framework installation and updates manage it with the rest of the Mosaic
runtime assets.
Start Pi, then set a goal:
```text
/goal set Deliver the feature, tests, documentation, and verification evidence
# Shorthand:
/goal Deliver the feature, tests, documentation, and verification evidence
```
Control and inspect the loop with:
| Command | Behavior |
| ---------------------- | ------------------------------------------------------------------ |
| `/goal status` | Show phase, limits, compaction checks, latest report, and evidence |
| `/goal pause [reason]` | Stop autonomous continuation while preserving the goal |
| `/goal resume` | Resume with fresh turn and no-progress counters |
| `/goal cancel` | Cancel the goal and remove its active status |
| `/goal help` | Show command help |
While a goal is active, Mosaic injects its contract before every Pi model request and checks every
completed model/tool turn. The agent ends each work cycle with the structured
`mosaic_goal_report` tool. `achieved` is provisional until a second consecutive report rechecks the
whole goal with evidence. A continuation report or a successful compaction resets provisional
verification.
Goal statements and reports are stored in Pi session data. Mosaic redacts common credential shapes
before appending its goal-state entries and before goal tool output or `/goal status`, but
pattern-based redaction is not a secret store. Pi's own model-message and tool-call records are
outside that redactor. Never put tokens, passwords, private keys, connection strings, or raw
sensitive output in a goal or report; cite the command, artifact, and pass/fail result instead.
The loop stops instead of running forever when it is paused, blocked, cancelled, verified, reaches
its turn limit, or repeats the same no-progress report too many times. Defaults are 40 turns and 6
repeated no-progress reports. Operators may lower or raise them within enforced bounds before
launching Pi:
```bash
MOSAIC_GOAL_MAX_TURNS=60 MOSAIC_GOAL_MAX_NO_PROGRESS=8 mosaic pi
```
Goal state is branch-specific Pi session data. It survives compaction and session resume, but Pi's
process still must be relaunched or supervised after a process/host failure. This initial verifier
checks structured evidence twice; it cannot mathematically prove every arbitrary natural-language
goal. Use explicit acceptance criteria and inspect `/goal status` for consequential work.
---
### Claude Code Skill Registration