Gate D written; brief for piece 4, the WebUI first screen on the Console design (#1506, #1503)

Co-Authored-By: Claude Fable 5.1 <[email protected]>
This commit is contained in:
2026-09-12 19:05:44 -05:00
co-authored by Claude Fable 5.1
parent 46ded3fcba
commit b7f8d1cc35
3 changed files with 73 additions and 8 deletions
+3 -4
View File
@@ -55,13 +55,12 @@ at every gate. Started 2026-09-12 during the control board MVP.
## Queue (Jason's order)
1. Ledger (piece 3, in progress, Gate D).
2. WebUI on Dewey's Console design absorbs the board as its first screen
(MOSAIC-STACK-D-002).
1. WebUI on Dewey's Console design absorbs the board as its first screen
(piece 4, MOSAIC-STACK-D-002, Gate E on Monday 2026-09-14).
3. Orchestrator seat: assigns tasks through `mosaic seat task`, closes the
"set by" gap.
4. Fleet launch through `mosaic launch`: the stress test.
## Done
- (none yet)
- Ledger (piece 3, #1506): shipped cd0aa5fb, Gate D written 2026-09-12 (18.9 human messages per closed issue).