Add control board status scanner and MVP plan (#1503)
Step 1 of the control board MVP (decision MOSAIC-STACK-D-001): a plan page, Gitea #1503, and packages/control-board, which reads each agent's newest pi session log plus tmux liveness and writes one status file per agent under <dataRoot>/board/. 23/23 tests; independent review approved after three fixes (length stopReason as error, unknown liveness state, secrets-boundary test). CURRENT.md now points at step 2, the page. Co-Authored-By: Claude Fable 5.1 <[email protected]>
This commit is contained in:
@@ -209,3 +209,6 @@ are never rewritten or removed; corrections are new entries.
|
||||
- 2026-09-12 — jarvis (Claude Code; owner-directed takeover of darkwing pi session 01a07cfa) — Recovered #1500 state from the session log; demo test reran 2/2 on 5abbabb7; issue open, remote refactor still 5abbabb7. Diagnosed owner demo failure: alacritty bash pid 2444405 (started 2026-09-07 14:26 UTC, before cutover) has cwd inode in the retired v1 copy; logical pwd printed the canonical path, HEAD read 5d277000, and a 2026-09-12 git pull fast-forwarded that copy to next 2101c9b4 (fred, #1502). No repository changes, commit or push; darkwing pi (pid 45527) left running.
|
||||
|
||||
- 2026-09-12 — jarvis (Claude Code, darkwing takeover) — #1500 owner acceptance recorded (Jason demo 2/2 at 5abbabb7) and issue closed via scripts/gitea-api.sh (comment 26007; Mosaic issue-close wrapper refused on seat token, fail-closed). Records-only commit; CURRENT next action is MVP re-plan against MOSAIC-STACK-D-001.
|
||||
- 2026-09-12 — dewey (Claude Code; owner-directed takeover of dewey pi session 01a08111) — Resumed WUI Phase 2 from agents/dewey/work/wui/TASKS.md: D01 source-linked feature inventory, then D02-D05 five dashboard mockups and comparison page, folding in MOSAIC-STACK-D-001 control board as the landing view. Prototype files only under agents/dewey/work/wui; no v1 inspection, backend, credentials, commit or push.
|
||||
|
||||
- 2026-09-12 — jarvis (Claude Code, coordinator) — Control board MVP step 1 (#1503, D-001): plan page, ticket, `packages/control-board` scanner + CLI, 23/23 tests, live scan 42 sessions/18 waiting on Jason; independent review CHANGES REQUIRED then APPROVED after three fixes (length→error, unknown liveness state, secrets-boundary test). Receipt docs/plans/reviews/2026-09-12_control-board-step1-review.md. CURRENT next action: step 2, the page.
|
||||
|
||||
Reference in New Issue
Block a user