docs(remediation): D-55f addendum — the #1030 attribution floor is a measured accident, and the merger arm rests on an interim arrangement

This commit is contained in:
mos-dt-0
2026-08-05 17:47:49 -05:00
parent 6d92234422
commit bd5afb0711
+11
View File
@@ -908,6 +908,17 @@ answer. be-coder-08 is charged (by Mos) with an end-to-end throwaway-PR proof in
that can return ABSENT. Until then, "the field will carry them" is an untested claim and must not be that can return ABSENT. Until then, "the field will carry them" is an untested claim and must not be
load-bearing in any GO. load-bearing in any GO.
**Addendum (Mos, 2026-08-05) — the floor is a MEASURED ACCIDENT, not a gate that held.** #1030's
poster happens to be its plurality author (f10-coder, 6/13), so the floor preserves the
most-represented contributor — but nobody chose that. f10-coder posted in the ordinary course, long
before anyone knew posting decided attribution; had a TL, a bot, or whichever seat opened the branch
posted it, all three authors would be lost and the artifact would look identical. **Recorded per
Mos's ruling: a favourable accident logged as a success is how the next lane inherits a floor that
is not there.** The one arm that makes the floor real is the merger, and it is currently satisfied
only by a temporary arrangement: **Mos is the interim homelab merge executor while `merge-gate`'s
token lacks `write:repository`** — a temporary arrangement carrying a permanent consequence, written
down as such.
### D-55b — two parties quoting a third is not corroboration ### D-55b — two parties quoting a third is not corroboration
The coordinator wrote _"installer-7's live-panel GREEN was the last thing before the command"_ **having The coordinator wrote _"installer-7's live-panel GREEN was the last thing before the command"_ **having