From c160de3dace96d11d8bf5699bb3f5e4b6ef141da Mon Sep 17 00:00:00 2001 From: Jason Woltje Date: Sun, 11 Oct 2026 17:31:04 -0500 Subject: [PATCH] decisions: 96, Q97 yes, next-target plan confirmed as written Co-Authored-By: Claude Opus 5.5 --- docs/SESSIONS.md | 1 + docs/plans/2026-09-26_lead-decisions.md | 28 +++++++++++++++++++++++++ 2 files changed, 29 insertions(+) diff --git a/docs/SESSIONS.md b/docs/SESSIONS.md index 97c3bb4e0..0361f1205 100644 --- a/docs/SESSIONS.md +++ b/docs/SESSIONS.md @@ -673,3 +673,4 @@ are never rewritten or removed; corrections are new entries. - 2026-10-11T22:27Z, Sage (lead): next-target plan sent to Mos for discussion; nothing moves. It covers Mos in the stack (rows M1-M3), iterating inside the deployment (D1-D4), and install paths with containers recommended and local supported (I1-I6; the pi worker image is the only container today). The open question to Mos is whether the Researcher starts the read-only I1 survey now. Darkwing's row 58 round 1 is in review, noted. - 2026-10-11T22:33Z, Sage (lead): Mos mos-0059 asked for two things. (1) The Researcher (T3 9bac0794) has the read-only I1 container survey, due 2026-10-12T18:00Z, written to agents/researcher/work/i1-container-survey/REPORT.md. (2) I drafted M1, a role for Jason's main agent, at agents/sage/work/next-target/M1-draft.md. It's a draft only, not in docs/plans or the queue, and waits on Q97 and Jason's approval of the role file. The I1 draft waits on the survey. - 2026-10-11T22:29Z, Sage (lead): correction. The line above stamped 22:33Z was estimated, not taken from the clock. The real time was about 22:29Z (commit a3d17005). +- 2026-10-11T22:31Z, Sage (lead): Mos mos-0060, Q97 yes. Lead decision 96 records the next-target plan as written: S7, then M1-M2, then D1-D2 with I1, then I2-I6, with I4 before M3. M1 and I1 move to docs/plans and the queue after the cutover rows. diff --git a/docs/plans/2026-09-26_lead-decisions.md b/docs/plans/2026-09-26_lead-decisions.md index 6fabbdc4c..051a91127 100644 --- a/docs/plans/2026-09-26_lead-decisions.md +++ b/docs/plans/2026-09-26_lead-decisions.md @@ -2073,3 +2073,31 @@ which stay with him. Each item names who decided it and what happened. the likeliest way the date slips. The cost is that the bus trail records a web send exactly as a CLI send, `human-cli`, until the label row. + +96. **Q97 yes: the next-target plan (2026-10-11).** Jason, relayed by + Mos (mos-0060): "Q97: yes". Mos reads it as the plan Sage sent + confirmed as written, not the faster option of M1 plus row 76. + - Three tracks: + - Mos in the stack (M1 a role for the main agent, M2 a thread + view, M3 a trial beside T3 Mos). + - Iterating inside the deployment (D1 a stack release and + rollback, D2 staging, D3 managed coders and reviewers, D4 CI). + - Install paths, containerized recommended and local supported + (I1 the design, I2 to I6 the images, the human proof inside + containers and the install mode). + - Order from 2026-10-13: S7, then M1-M2, then D1-D2 alongside I1, + then I2-I6. I4, a Console with signed-in human authority, lands + before M3 retires T3 Mos. The M3 trial is about 10-17. The + install track ends about 10-24, 10-31 at worst. + - Briefs and rows: the M1 and I1 drafts under + `agents/sage/work/next-target/` move to `docs/plans/` and the + queue after the cutover rows (74-76) and ops-01's route. Those + keep priority. The Researcher's read-only I1 survey goes on (due + 2026-10-12T18:00Z). + - Still Jason's: approving the M1 role file (a policy change), + ratifying I1, and when T3 Mos retires. Each goes to Mos as a + short item when it's ready. + - The tradeoff: Mos stays a T3 thread for about a week longer than + the faster option. In exchange, the in-stack Mos never runs with + its wider authority under Jason's user, with PID-only isolation, + for more than the trial.