diff --git a/docs/plans/CURRENT.md b/docs/plans/CURRENT.md index 107d07cc..bc2080eb 100644 --- a/docs/plans/CURRENT.md +++ b/docs/plans/CURRENT.md @@ -7,13 +7,14 @@ update this file to the next action). No ambiguity, no re-planning. ## Next action -Gitea issue: (none queued — awaiting owner direction) +Owner decision on M9: mission-level capability policy (design sketch: missions may declare default tool sets; tasks inherit unless overridden; conductor validates the merge). Say "next" to proceed or name a different target. ## Queue (ordered, not started) -1. Owner review of M5–M8 (workspaces, capabilities, sessions, conductor loop) -2. M8 follow-up: retry lineage (retriedFrom field) + relative-mission-path retry limitation -3. M9 candidates: mission-level capability policy; run-record retention; decision on auto-apply policy for worker patches +1. M9: mission-level capability policy +2. Run-record retention/pruning policy +3. Second real adapter (parked — owner focused on Pi) +4. Auto-apply policy for worker patches (deferred until capability policy exists) ## Rules @@ -31,3 +32,5 @@ Gitea issue: (none queued — awaiting owner direction) - 2026-09-03 — M6 named sessions + resume (#22, #23) — merged, teach/recall verified - 2026-09-03 — M7 run inspection + release 0.0.6 (#24) — merged, activated - 2026-09-03 — M8 conductor loop + worker-built retry (#25, #26, #27) — merged; worker authored retry in 2 refinement rounds, conductor fixed a 3-line interpolation rename; live retry verified +- 2026-09-03 — retry lineage + relative mission resolution (#28) — merged, 36/24/14 suites + verify green +- 2026-09-03 — M8 conductor loop + worker-built retry (#25, #26, #27) — merged; worker authored retry in 2 refinement rounds, conductor fixed a 3-line interpolation rename; live retry verified