docs(ci): correct the merge-ref claim; PR CI tests the head tree
My own comment asserted 'PR CI tests the merge ref, whose tree equals the landed squash commit' - never measured. Pipeline API refs show pull_request runs execute refs/pull/N/head (2542, 2545): the head tree, not a merge ref. If next advances between run and merge, the landed tree differs from the tested one; that residual is what publish verify re-covers post-merge (full verify:release on the push, PGlite path). Same evidence discipline this PR exists to enforce; the claim is corrected to what was measured.
This commit is contained in:
+6
-6
@@ -12,12 +12,12 @@ when:
|
||||
# Push CI runs on main only. next deliberately runs NO push ci: post-merge
|
||||
# verification on next is carried by publish.yml's `verify` step
|
||||
# (pnpm verify:release), which mirrors this pipeline's complete mandatory
|
||||
# set step-for-step, enforced by scripts/verify-release.test.mjs. The two
|
||||
# things push-to-next does not re-run, the postgres-path test and a
|
||||
# push-ci status context, duplicate pre-merge coverage: PR CI tests the
|
||||
# merge ref, whose tree equals the landed squash commit. Measured
|
||||
# 2026-08-19: the 21 most recent push events on next each ran exactly one
|
||||
# pipeline (publish), zero ci.
|
||||
# set step-for-step, enforced by scripts/verify-release.test.mjs. PR CI
|
||||
# tests the PR HEAD tree (refs/pull/N/head, measured 2026-08-19), not a
|
||||
# merge ref, so if next advances before a merge the landed tree differs
|
||||
# from the tested one; publish verify re-runs the full set on the landed
|
||||
# tree (PGlite path). Measured 2026-08-19: the 21 most recent push events
|
||||
# on next each ran exactly one pipeline (publish), zero ci.
|
||||
# Keeping push ci off next also avoids a redundant second full-suite run
|
||||
# per merge on the storage-constrained runner.
|
||||
- event: [pull_request, manual]
|
||||
|
||||
Reference in New Issue
Block a user