docs: W brief D2 lets O2 rows build before 10-27 and land only on an idle slot, Opus 5.5 review once at landing (mos-1571); register Codex seats Glomgold (row 309, W1) and Gyro (row 310, W2); doc only

This commit is contained in:
jason.woltje committed 2026-10-24 00:26:11 -05:00
1 parent 48f1627be2
commit d16958bcfd
3 files changed
+25 -4

No files matched your search

+6 -4
View File
@@ -27,8 +27,9 @@ pane, persistent chat in the right, a draggable divider, document navigation, pi
right-click thesaurus. It is not a reskinned row 154 editor. The first useful release, opened at W7 after the required gates, must
pass writing, footnote, comment, tracked-change and page-layout save/reopen tests together.
D2. Q210/Q220 allow design and review now. O2 builds remain after the October 27 MVP work
and never take its gate slot. S0 baseline clearance is conditional on M1–M14, Fenton/Filbert
D2. Q210/Q220 allow design, review and builds ahead of the October 27 MVP work (mos-1571).
O2 rows never take the gate slot ahead of a v1 row; they land only when the slot would
otherwise sit idle. S0 baseline clearance is conditional on M1–M14, Fenton/Filbert
at `origin/fenton/q195-s0` 74ec32013 (#1798, Sage PASS comment 30917). Q234 approves the
exact measured frame CSP; the shell stays unchanged. mos-1363 requires W2 to remeasure zero
violations with style-src 'self'; no rfd style hash is approved. These gates are satisfied
@@ -585,14 +586,15 @@ Their implementation gates remain separate. No code row W1/W2/W6/W3a/W3b/W3/W4b/
before S0 PASS (recorded for this baseline, with M1–M14 still binding). Each also observes its explicit dependencies, source ownership, the CSP gate
and the MVP gate-slot priority. Q177 permits chaining reviewed candidates, not overlapping
owners. Sage assigns model-only seats. Each implementation reviewer is Opus 5.5 and did not
author the code. Fenton reviews this design and can review code only when not its author.
author the code. A Codex-built row gets its first reviews from a separate Codex thread (Q246);
the Opus 5.5 review runs once, on the landing candidate (mos-1571). Fenton reviews this design and can review code only when not its author.
Build order (mos-1470, Vikunja 571 comment 961): W7 first supplies reviewed conversion/format
routing code with production import still closed, then W8 lands the Connections view, then
W7's human opening step may open the first real chapter import. W8 is after W3/W4b and
W7's closed routing candidate, before that W7 opening step. This is Mos's build-order rule,
not a new REQ-LIB-8 condition or an addition to import acceptance. No converted real chapter
exists without the view. O2 code remains after 10-27 and never ahead of MVP rows.
exists without the view. O2 code may be built before 10-27 (mos-1571) but never lands ahead of MVP rows.
G1. Future code acceptance runs each touched test file independently and affected package
suites on Sage's slot after MVP priority, plus required repository checks. Source builds need