Register completed registry alignment records
This commit is contained in:
@@ -1890,3 +1890,7 @@ Owner authorized reviewed fix/commit/push without live restarts or deployment. B
|
|||||||
## 2026-09-08 — #1498 reviewed repair published
|
## 2026-09-08 — #1498 reviewed repair published
|
||||||
|
|
||||||
Independent APPROVED c4dd2ad8; repair f3dce3208877626043c521c6ef5076f9559309b0 pushed and remote verified. Nine file identities plus old-path deletion verified from committed tree; fresh archive fixture run 5/5 passed. Initial staged-path assertion failed on rename display and shell continued to commit; exact expanded-path and byte verification succeeded before push, recorded in completion receipt. No live operations. Other work preserved.
|
Independent APPROVED c4dd2ad8; repair f3dce3208877626043c521c6ef5076f9559309b0 pushed and remote verified. Nine file identities plus old-path deletion verified from committed tree; fresh archive fixture run 5/5 passed. Initial staged-path assertion failed on rename display and shell continued to commit; exact expanded-path and byte verification succeeded before push, recorded in completion receipt. No live operations. Other work preserved.
|
||||||
|
|
||||||
|
## 2026-09-10 — registry draft gates 5/6 resolved
|
||||||
|
|
||||||
|
Independent R1 SUPPORTED the Gate 7 reconciliation; Jason answered yes to all three O3 decisions. Draft gates 5/6 marked RESOLVED (owner 2026-09-10) and runtime-selection revised to per-execution semantics with fork pinning. R2 REQUEST CHANGES caught stale CURRENT/reconciliation status; corrected and re-frozen; follow-up APPROVED at 2ec6634f (request-changes record preserved append-only). Committed b8008eda5d2a2971caca46ea004d759cab888001, pushed, remote verified. No implementation; remaining gates stay open.
|
||||||
|
|||||||
@@ -147,3 +147,26 @@ are never rewritten or removed; corrections are new entries.
|
|||||||
- 2026-09-08 — darkwing — #1498 owner goal skill/launcher mismatch: isolated Pi launcher fixtures reproduced failure, stale required ms-agent-watch path absent while ms-watch replacement exists. Plan docs/plans/2026-09-08_skill-launcher-mismatch.md; no live launch or deployment. Other work preserved.
|
- 2026-09-08 — darkwing — #1498 owner goal skill/launcher mismatch: isolated Pi launcher fixtures reproduced failure, stale required ms-agent-watch path absent while ms-watch replacement exists. Plan docs/plans/2026-09-08_skill-launcher-mismatch.md; no live launch or deployment. Other work preserved.
|
||||||
|
|
||||||
- 2026-09-08 — darkwing for Filbert — #1498 SKILL-LAUNCHER-FILBERT-1 independently APPROVED c4dd2ad8; exact repair published f3dce320, remote verified, committed-tree fixtures 5/5 passed. Rename-display assertion issue reconciled before push via expanded path/byte verification; completion receipt preserves it. No live activation or unrelated changes.
|
- 2026-09-08 — darkwing for Filbert — #1498 SKILL-LAUNCHER-FILBERT-1 independently APPROVED c4dd2ad8; exact repair published f3dce320, remote verified, committed-tree fixtures 5/5 passed. Rename-display assertion issue reconciled before push via expanded path/byte verification; completion receipt preserves it. No live activation or unrelated changes.
|
||||||
|
| 2026-09-09 01:34 UTC | Codex | Owner-corrected Sage location | Added agents/sage with DYOR strategy records and native project launch; old brain shim forwards here; six offline tests and both local --check routes pass; no model session or history import |
|
||||||
|
|
||||||
|
- 2026-09-09 | Sage | Jason-assigned DYOR/Afterlife business review | Read founder history and historical plans; discovered separate DYOR checkouts and Afterlife source; captured six public sources, verified market/economic calculations, drafted first advisory briefing under agents/sage/work/dyor-strategy; awaiting owner objectives/constraints; no product code, fleet, deployment, commit or push changes.
|
||||||
|
|
||||||
|
- 2026-09-08 — darkwing — COO-Q232-VENUE-20260909: Jarvis-requested same-host venue reconciliation; identity/native-development remit and authoritative CURRENT/team pointers sent directly to Velma and Jarvis on mosaic-fleet. Both transport exits 0, application acceptance unknown. Default-socket return venue supplied; no implementation assignment or managed-fleet identity adopted.
|
||||||
|
2026-09-09 | Sage | DYOR/portfolio strategy: recorded owner product/brand/LP corrections, 36 idea concepts and reproduced guide/micropayment examples; Jarvis verified 10-file packet and acknowledged intake; orch-01 coordination unconfirmed, reviewer pending. Evidence: agents/sage/work/dyor-strategy/COMMUNICATIONS.md and IDEA-SLATE-01-2026-09-09.md. No code, outreach, spending or deployment.
|
||||||
|
|
||||||
|
- 2026-09-08 — darkwing — BMA-FOUNDATION-POINTERS-VELMA-7B859C4E1: existing source references checked at 50d2a2eb and sent to Velma/mosaic-fleet; handoff docs/plans/reviews/2026-09-09_bma-foundation-pointer-handoff.md distinguishes local CLI contracts from registry/schema drafts and offline inspector preview. Transport exit 0, application acceptance unknown. No implementation scope or private reads.
|
||||||
|
2026-09-10 | Sage | Recorded DYOR/Joe broad education/media direction and Jason-proposed Carmen JV structure; verified target arithmetic and 3 primary-source captures. Jarvis recovered original review non-dispatch; independent 15+ ideas pending first reviewer ACK, preservation register created. Evidence: agents/sage/work/dyor-strategy/PORTFOLIO-AND-JV-2026-09-10.md. No legal filing, spending, outreach, code or deployment.
|
||||||
|
2026-09-10 | Sage | Recorded owner consensus/no-exclusive-domain clarification, S-curve hypothesis, gated founder subsidies and possible joint IP LLC; mapped 15 revenue families, verified 2 primary IP source hashes. Evidence: agents/sage/work/dyor-strategy/CONSENSUS-IP-AND-REVENUE-2026-09-10.md. Legal/entity specifics and independent idea report remain pending; no external execution.
|
||||||
|
2026-09-10 | Sage | Recorded outcome-first business map, five-person ambition and legal-detail deferral; shared Jason/Carmen agent strategy repo with AGENTS.md/CLAUDE.md tracked as S15 explicitly deferred, not configured. Evidence: agents/sage/work/dyor-strategy/VISION-AND-BUSINESS-MAP-2026-09-10.md and TASKS.md.
|
||||||
|
2026-09-10 | Sage | Recorded promising first-prospect meeting and owner $20k-$50k LTV hypothesis, separating opportunity from revenue/cash and proposed phased work from approved scope. Evidence: agents/sage/work/dyor-strategy/FIRST-PROSPECT-2026-09-10.md, S16. No prospect outreach or financial/implementation action.
|
||||||
|
2026-09-10 | Sage | Recorded owner-endorsed prospect phasing and equal large-scale ambitions across four businesses; drafted buyer/revenue/proof map and shared capability path, preserving governance/IP boundaries. Evidence: agents/sage/work/dyor-strategy/PORTFOLIO-PATH-2026-09-10.md, D13/S17. No execution or guaranteed forecast.
|
||||||
|
2026-09-10 | Sage | Recorded BMA funnel-module idea and scope/expertise concerns; read full BMA PRD and mapped core/module/integration boundaries without changing engineering files. Evidence: agents/sage/work/dyor-strategy/BMA-JOURNEYS-AND-SCOPE-2026-09-10.md, D14/S18. Competitive uplift and live capability unverified.
|
||||||
|
2026-09-10 | Sage | Received/read and SHA-256 verified both plan-01 originals, preserved 22 additions and critique plus provenance/index; 58 total concepts/variants. Separate reconciliation applies later owner direction; ACK to Jarvis rc=0. Evidence: agents/sage/work/dyor-strategy/reviews/plan-01-original-20260910/RECEIPT.json. No new review or execution.
|
||||||
|
|
||||||
|
- 2026-09-10 — darkwing — Registry review alignment began: Gate 7 reconciliation drafted (957f7e6b) with source pins at 50d2a2eb; O1 interview search closed, no contradicting ruling. Independent REGISTRY-GATE7-FILBERT-1 request dispatched, transport exit 0, application acceptance unknown. Review-only; no implementation authorized.
|
||||||
|
|
||||||
|
- 2026-09-10 — darkwing for Filbert — REGISTRY-GATE7-FILBERT-1 independent verdict SUPPORTED; O2 closed, snapshot unchanged, both framing notes accepted. Registry alignment now rests on three open owner decisions (O3); no implementation authorized.
|
||||||
|
|
||||||
|
- 2026-09-10 — darkwing — Owner ruled yes to all three O3 decisions (fork pins original account; unpinned relaunch uses profile default; named launch profiles deferred). Registry draft gates 5/6 marked RESOLVED and runtime-selection section revised to per-execution semantics. Pending focused r2 review before any commit.
|
||||||
|
|
||||||
|
- 2026-09-10 — darkwing — REGISTRY-GATE7-FILBERT-R2 follow-up APPROVED at 2ec6634f; owner rulings and draft revision committed at b8008eda and pushed, fresh remote identity verified. Documentation only; gates 2/3/4/7/8/9/10 remain owner decisions, no implementation authorized.
|
||||||
|
|||||||
@@ -14,9 +14,10 @@ REGISTRY-GATE7-FILBERT-1 SUPPORTED the Gate 7 reconciliation. Record:
|
|||||||
Jason resolved all three O3 decisions on 2026-09-10 (fork pins account;
|
Jason resolved all three O3 decisions on 2026-09-10 (fork pins account;
|
||||||
unpinned relaunch uses default; named launch profiles deferred); draft gates 5/6
|
unpinned relaunch uses default; named launch profiles deferred); draft gates 5/6
|
||||||
now record those rulings and the runtime-selection section uses per-execution
|
now record those rulings and the runtime-selection section uses per-execution
|
||||||
semantics. Next action: complete the focused r2 review of the revised draft,
|
semantics. Completed: R2 follow-up APPROVED at 2ec6634f; documentation committed
|
||||||
then commit exactly the approved bytes. Remaining draft gates 2/3/4/7/8/9/10 are
|
at b8008eda5d2a2971caca46ea004d759cab888001 and pushed; fresh remote identity
|
||||||
still owner decisions; no registry implementation is authorized.
|
verified. Remaining draft gates 2/3/4/7/8/9/10 are still owner decisions;
|
||||||
|
no registry implementation is authorized.
|
||||||
|
|
||||||
Owner goal #1498 completed: independently approved skill/launcher repair published
|
Owner goal #1498 completed: independently approved skill/launcher repair published
|
||||||
at f3dce3208877626043c521c6ef5076f9559309b0; fresh remote identity verified and
|
at f3dce3208877626043c521c6ef5076f9559309b0; fresh remote identity verified and
|
||||||
|
|||||||
Reference in New Issue
Block a user