docs: BUILD-LOG for the 3e window and the vikunja-19 landings; Sage and Dewey SESSIONS lines

BUILD-LOG: the live bus window 3b to 3e and rows 144 and 145.
SESSIONS: Sage's window and landing lines, and Dewey's row 136 round 1
line, left for this sweep. Rocko's 22:26 and Researcher's 22:44 lines stay
uncommitted for their seats.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
This commit is contained in:
2026-10-15 17:53:52 -05:00
co-authored by Claude Opus 5.5
parent e941e3905e
commit dda7e31b0c
2 changed files with 35 additions and 0 deletions
+32
View File
@@ -4803,3 +4803,35 @@ Sage approved schema3b→3c and the land-work scope extension (sage-0299/0303/03
Evidence: targeted seven-step gate bus178 tasks97 cli195 webui112 harness84 seat132 and land-work84, zero failures/skips; DOCKER_HOST=unix:///nonexistent.sock throughout, no Docker run/network. Initial missing dependency link and then real pinned-copy migration-path defect were fixed and their failed logs retained; full targeted gate reran, bus coverage reran after two final migration cases. No known flake recurrence. All22 mutants killed, no timeouts/invalid/survivors; all17 source hashes restored, independent base+patch reconstruction verifies17/17, postmutant restart/skew5/5 and empty process sweep. Slot clear to Sage16:18:57UTC.
Packet agents/rocko/work/queue-49/r1; base7b166a0f1, manifest87ef1321a1a08be64a20499889fc24b5549b47d6d33abfd86db95f62fb3cb6d0 (17 paths). Claim1272, in-review1276, expected failed request1277/exit1 (no MOSAIC_GITEA_CREDENTIAL_FILE); Sage posts as jarvis for Darkwing/Filbert. Candidate source uncommitted; no live database/config/unit/Console/Settings action, no push.
### 2026-10-15 22:26 UTC, Sage and Mos: live bus window, schema 3b to 3e (rows 49, 123, 132, 121)
Before: the live bus and Console ran copy 2f57e3c59 at schema 3b. After: bus, Console and CLI all run copy fc5b342f839498b46499fe8f00c79dd78ba9e1e4, which carries 3a4afdc03 (row 49), 89fd2d6fe (123), 0e947c216 (132) and 2c16d6b93 (121), and the store is at 3e. Plan: agents/sage/work/window-plan/schema-chain-3c-3e.md. Mos gave the go for steps 2 to 6 and ran step 7.
- Step 1: `stack-copy.sh copy` made NEW fc5b342f8. OLD rollback copy is 2f57e3c59.
- Step 2: Mos stopped the Console at 22:09:39Z. Sage stopped the bus at 22:10:33Z, rc 0. Check 2 found no live run process, and every role's latest role_claims op was release, so no assistant claim was open going into 3e (row 121 F2 didn't apply).
- Step 3: `cp -a` of the stopped bus directory to /mnt/storage/scratch/sage-w3e/bus-backup/. The bus.sqlite sha256 matched the live file.
- Step 4: the migration on a copy of the backup printed "bus schema 3e ready" in about 3 s, with two notes: one undelivered message kept for cto and one for human, without a thread. Neither is a thread instance.
- Step 5: the live migration at 22:10:55Z printed the same. meta reads schema_version 3e and comment_cursor_epoch 2026-10-15T22:10:55.208Z.
- Step 6: `bus-service.sh install --copy fc5b... --pm --claude ~/.local/bin/claude`, rc 0, started 22:10:59Z. The log shows "bus host up" and "launched chief: run rd8e9570f0ea0". From 22:10Z to 22:13Z there were no rate-limit lines (12 lines, control line present). The chief's bundle manifest has end_run and change_organization typed and nothing untyped, which is row 132's check. `scripts/land-work/read.mjs` from canonical gets past bus-schema for decision 29ff6589 and then refuses work-ref, as expected for a decision naming four refs.
- Step 7 (Mos): `webui-service.sh install --copy fc5b...`, `stack-copy.sh wrapper fc5b...` and the Console start, all rc 0, the start finishing at 22:24:54Z. At 22:24:59Z both units were active, healthz 200, and an anonymous mosaic.woltje.com request got 302. /api/bus-status returns not found because task 302 (row 144) landed after this copy.
- Check: `scripts/stack-copy.sh check` at about 22:26Z shows bus, Console and CLI on fc5b342f8, rc 0.
After the start only chief runs. That is by design: the business file's launch.by is chief, so `--pm` launches chief, and chief launches pm and the others when work arrives. Before the window pm was also chief-launched (bus event 693, role.launch by chief, then 694).
Not done: the Claude resume smoke becomes Jason's `[mos test]` talk. No Docker gate ran, so there was no network to remove. Rollback stays the backup plus OLD, with the bus stopped and Mos's go.
### 2026-10-15 22:53 UTC, Sage: the eight vikunja-19 merges landed on refactor (rows 144 and 145)
Before: Jason had approved eight merge decisions in the mosaic-stack business (29ff6589, 0eebf83f, 17bb9efc, 12a20e47), and none of the commits were on refactor. Mos relayed the landing instruction and a standing push go for the eight after a green gate. Brief: docs/plans/2026-10-15_vikunja-19-landings.md.
After, on local refactor:
- Row 144 (#1638), applied unchanged: 297 as 19fabe47c, 302 as 91b963e25 and 301 as 193ae70c6.
- Row 145 (#1639), rebased: 306 as 92938ab43, 295 as e9f4431ec, 307 as ae74c25fd, 305 as 467a313c7 and 309 as fba879f6a. Three conflicts were text only. In round 1 Filbert found that 306's csuite-messaging.test.mjs failed 15 of 16 on the new base (thread-required since row 121). That needed a fixture-only fix, which I folded into 306, and round 2 was approved (28625).
Gate: the full template on 9357baac9, the same tree as the landed packages, roles and scripts, ran 22:45:55Z to 22:50:33Z with GATE_PASSED, 24 steps rc 0 and no flake. `queue review verify-commit 145 HEAD` matches the 48-path candidate. Packet: agents/sage/work/queue-145/BUILD.md.
Correction: in round 1 my single-file runs covered only the conflict tasks' tests and missed csuite-messaging. Now every test file a rebase touches runs before the in-review move.
Not done: no live re-pin, which waits on Mos's go.
+3
View File
@@ -1021,3 +1021,6 @@ are never rewritten or removed; corrections are new entries.
2026-10-15T22:38:04Z | Filbert (Opus 5.5, 048f3c63) | row 145 round 1 review (#1639, Sage, vikunja-19 rebases), candidate c8272046...8a92 | changes, comment 28623, rev 1385: text resolutions are conflict resolution only; 306 csuite-messaging.test fails 15/16 on the candidate (thread-required since row 121); fixture-only probe passes 16/16
2026-10-15T22:42:40Z | Filbert (Opus 5.5, 048f3c63) | row 145 round 2 review (#1639, Sage, vikunja-19 rebases), candidate c65e1ada...157b | approve, comment 28625, rev 1395: only the 306 csuite-messaging setup() changed (thread for the assistant, no assertion change); 15 changed test files 162/0 plus 6 neighbours
2026-10-15T22:49:18Z | Filbert (Opus 5.5, 048f3c63) | row 142 r1 review (#1636, Researcher, talk prints only its own reply) | approve, comment 28627, rev 1403, candidate 1220d134...e7; verbs/follow/tester 6/6, 2 own mutants killed; notes: skipped messages unreadable from CLI, stale Console talk text, one long TOOLS.md line
2026-10-15T22:27:01Z | Sage (Opus 5.5, 1ef1e4f8) | live bus window 3b to 3e (rows 49, 123, 132, 121) | steps 1-6 Sage with Mos's go, step 7 Mos; bus, Console and CLI on copy fc5b342f8, store 3e, stack-copy check rc 0; resume smoke is Jason's [mos test] talk; BUILD-LOG entry; OLD 2f57e3c59 plus backup sage-w3e/bus-backup is the rollback
2026-10-15T22:30:46Z | Dewey (Opus 5.5, 84fb346c) | row 136 (#1630) build, approvals bind to the role instance and thread | in review round 1, candidate 38b0d3cda5b7f69a0a4c60fc0434c66ba8cc8e7b834fcb865383dd2ee6d711e8 on e37d6e583, packet 8e2c5c2d0 (local); owner's gate 22:25:05Z-22:29:11Z exit 0 (bus + 6 importing packages + 10 scripts), mutants 4/4 killed; revs 1380-1381, request 28619, withdraw follow-up 28620; no push, revs and this line for Sage's sweep
2026-10-15T22:53:44Z | Sage (Opus 5.5, 1ef1e4f8) | rows 144 (#1638) and 145 (#1639), the eight vikunja-19 landings | 145 round 2 approved by Filbert (28625); gate on 9357baac9 GATE_PASSED 24/24; landed 19fabe47c, 91b963e25, 193ae70c6 (144) and 92938ab43, e9f4431ec, ae74c25fd, 467a313c7, fba879f6a (145); 145 done rev 1404; queue revisions 1353-1404 committed e941e3905; ready for one push under Mos's standing go; no live re-pin