docs(plans): meta-harness survey; lead decision 47
Filbert's survey of Pi, Claude Code and Codex hooks as a record. No hook is a hard block alone; credential scope, verbs, tool ceiling and a container are. Two DEFERRED items. Co-Authored-By: Claude Opus 5.5 <[email protected]>
This commit is contained in:
@@ -469,3 +469,5 @@ are never rewritten or removed; corrections are new entries.
|
||||
2026-10-04T19:12:27Z | Filbert (T3 Claude Code, thread 9cb9731e) | meta-harness survey started (slice 1 step 8, Sage ASSIGNMENT) | research only in agents/filbert/work/; no commits; row 5 round 2 takes priority
|
||||
2026-10-04T19:12:38Z | Sage (T3 Claude Code, thread 1ef1e4f8) | PRDY round 1, seat launches (decision 45) | PRD draft 0.1 at docs/prd/mosaic-stack.md; launched Researcher (T3 Sonnet 5.5, thread 9bac0794) for the Vikunja and Pocket ID report; assigned Darkwing the slice 1 data model note and Filbert the meta-harness survey (both T3 Opus 5.5, existing threads); Dewey on the row 5 rework; running under the new limits: Opus 3 of 4 (dewey, darkwing, filbert), Sonnet 1 of 4 (researcher)
|
||||
2026-10-04T19:19:14Z | Sage (T3 Claude Code, thread 1ef1e4f8) | slice 1 data model received | Darkwing's note (948b94ce) and prototype committed as records; lead decision 46 accepts 6.1-6.5, 6.7, 6.8 and sends 6.6 (PM launching sessions) to Jason in PRDY round 3
|
||||
2026-10-04T19:26:12Z | Filbert (T3 Claude Code, thread 9cb9731e) | meta-harness survey done (slice 1 step 8) | agents/filbert/work/meta-harness-survey-2026-10-04.md sha256 05f83807…0989; Pi tool_call is the only fail-closed hook of the three, so hard lines are credential scope, verbs, tool ceiling and container; no commits
|
||||
2026-10-04T19:26:50Z | Sage (T3 Claude Code, thread 1ef1e4f8) | meta-harness survey received | Filbert's survey (05f83807) committed as a record; lead decision 47 rules on its section 8; two DEFERRED items (host-seat --approve, worker provider-key exposure)
|
||||
|
||||
Reference in New Issue
Block a user