ci(web): Phase P6 — vite build + headless E2E gate on every trunk merge (#1445) (#1454)
ci/woodpecker/push/publish Pipeline was successful

This commit was merged in pull request #1454.
This commit is contained in:
2026-08-27 15:26:10 +00:00
parent b5ee692843
commit e605c83b27
19 changed files with 592 additions and 120 deletions
+17
View File
@@ -254,6 +254,23 @@ steps:
depends_on:
- typecheck
# Canonical verify:release stage `build` (#1445, P6): every PR proves the
# full workspace build — including the SPA `vite build` — before merge,
# instead of leaving build breakage to surface post-merge in publish.yml's
# verify step. Same canonical command the publish pipeline's build step runs.
build:
image: *node_image
commands:
- *enable_pnpm
- pnpm build
depends_on:
# after test, not typecheck: turbo gives `test` a ^build dependency, so
# running this step concurrently with test would put two independent
# turbo builds on the same shared-workspace dist/ and turbo cache with
# no cross-process locking — the same serialization invariant
# publish.yml documents for #1411.
- test
services:
ci-postgres:
image: pgvector/pgvector:pg17