docs(plans): goals review with ledger evidence, lead decision 27
Co-Authored-By: Claude Opus 5.5 <[email protected]>
This commit is contained in:
@@ -418,3 +418,5 @@ are never rewritten or removed; corrections are new entries.
|
||||
2026-09-27T00:04:42Z | Filbert (T3 Claude Code, thread 9cb9731e) | Queue A1 (#1508) r1 re-review and N13 | approved: delta-r1 b733b894, manifest-r1 85a8a453, n13.patch 00868b2f; review agents/filbert/work/queue-a1-review-r1-2026-09-26.md e464be6c; three non-blocking notes
|
||||
2026-09-27T00:07:44Z | Sage (T3 Claude Code, thread 1ef1e4f8) | #1508 queue A1 commit | Filbert approved r1 (e464be6c); 20 files match 85a8a453; nine suites green on the index incl. queue; test-queue.sh added to AGENTS.md suites; lead decision 26 (P1-P3 to A2, N13-a declined). A2 started.
|
||||
2026-09-27T00:10:31Z | Sage (T3 Claude Code, thread 1ef1e4f8) | #1508 N13 commit | nested node --test fix in test-foundation/test-discord; pins 60f04822/2ad3be74 match; nine suites green on the index (foundation 44, discord 64); DEFERRED entry closed.
|
||||
2026-09-27T00:11:29Z | Filbert (T3 Claude Code, thread 9cb9731e) | CHAT-03 brief R2 review (#1507 row 5), BRIEF-r2 5c5b45a2 | changes requested: F1 extension turn can overlap Mosaic preflight (spurious agent_settled, order-based attribution unsound), F2 empty clear_queue omits extension custom messages; B2-B6 and N1-N12 closed; review agents/filbert/work/chat-03-brief-review-r2-2026-09-26.md d149e8cc
|
||||
2026-09-27T00:21:33Z | Sage (T3 Claude Code, thread 1ef1e4f8) | goals review, SetSpark deploy decision | Jason: decide. Deploy of shared-signals cc74d92 handed to the stack operator seat (12fe8cda). Goals review page written from ledger evidence (47.7, 33.0 human msgs per closed issue vs <10); CHAT-03 source held for rescope; two-round brief budget. Lead decision 27. North star to Jason for ratification.
|
||||
|
||||
@@ -317,3 +317,17 @@ which stay with him. Each item names who decided it and what happened.
|
||||
separately. N13-a, having the check apply the patch instead of copying
|
||||
the suites, won't be done: the approval pins the patch and the suite
|
||||
hashes, and Filbert applied the patch himself. Darkwing starts A2 now.
|
||||
27. **Goals review, and the SetSpark deploy decided.** Jason asked Sage to
|
||||
decide instead of asking him. The SetSpark approver fix (cc74d92)
|
||||
deploys. Sage handed the deploy and the read-only production survey to
|
||||
the shared-signals stack operator seat (T3 thread 12fe8cda), which
|
||||
follows that repo's rules and host holds. Sage does not touch VM 1022.
|
||||
Jason also asked whether the north star and goals need a review. They
|
||||
do. The ledger shows human messages per closed issue at 47.7, then
|
||||
33.0, against a goal of under 10, and one issue closed last week. See
|
||||
`docs/plans/2026-09-27_goals-review.md`. In effect now:
|
||||
- CHAT-03 source work waits for a rescope against Gate E;
|
||||
- briefs get two review rounds, then scope is cut;
|
||||
- work for other repositories goes to their own seats;
|
||||
- the ledger runs every Monday.
|
||||
Jason ratifies the north star sentence and the goal order.
|
||||
|
||||
@@ -0,0 +1,83 @@
|
||||
# Goals review, 2026-09-27
|
||||
|
||||
Jason asked whether the north star and goals need a review. Sage's answer
|
||||
is yes. This page gives the evidence, a proposed north star and goals, and
|
||||
what changes now. Jason ratifies the north star, because it is his.
|
||||
Everything else on this page is a lead decision (item 27) and is already
|
||||
in effect.
|
||||
|
||||
## Evidence
|
||||
|
||||
No file in the repository states a north star. AGENTS.md tells agents to
|
||||
resolve ambiguity "in favor of the mission, goal, north star", but none is
|
||||
written down. QUEUE.md says Jason is preparing the target for the next
|
||||
phase.
|
||||
|
||||
The one measured goal is QUEUE row 7: under 10 human messages per closed
|
||||
issue. The ledger (`packages/ledger`, run 2026-09-27) gives:
|
||||
|
||||
| Week (UTC) | Issues closed | Median hours open | Human messages per closed issue |
|
||||
|---|---|---|---|
|
||||
| 09-06 to 09-12 (Gate D) | not recorded | not recorded | 18.9 |
|
||||
| 09-13 to 09-19 | 3 | 7.5 | 47.7 |
|
||||
| 09-20 to 09-26 | 1 | 283.3 | 33.0 |
|
||||
|
||||
The number went the wrong way. Most of the cause is that almost nothing
|
||||
closes. #1503, #1507, #1508 and #1509 have been open for two weeks.
|
||||
Pieces are opened, reviewed for several rounds and partly landed, but
|
||||
not finished.
|
||||
|
||||
The review loop costs more than the defects it catches, at least in brief
|
||||
work. The CHAT-03 brief is over 1,100 lines. It has had three rounds, and
|
||||
its reviewers found nine blocking issues, all about what pinned Pi can
|
||||
prove about its own queue and turns, for a piece that is fixture-only.
|
||||
The findings are real, but the piece has grown past what Gate E needs.
|
||||
|
||||
The lead's own time also drifted. On 2026-09-26 a large share of Sage's
|
||||
session went to a SetSpark service fix in another repository. It was
|
||||
delegated and worth doing, but it isn't this project's goal.
|
||||
|
||||
## Proposed north star (Jason ratifies)
|
||||
|
||||
Jason states what he wants. The agents take it from request to a
|
||||
verified, committed result on the new stack, and Jason isn't the
|
||||
messenger between them.
|
||||
|
||||
The measure is the ledger: human messages per closed issue, and the
|
||||
number of issues closed per week. Both are already computed.
|
||||
|
||||
## Proposed goals, in order
|
||||
|
||||
1. **Close what is open.** Finish before starting. Each open issue gets
|
||||
either a closing piece or a written reason it stays open. The target is
|
||||
#1509 rows 23 to 25 (live checks only), #1512 and #1511 (landed) and
|
||||
#1503 (MVP ruling).
|
||||
2. **Queue as data (#1508, Gate G).** Required, and Jason called it
|
||||
iron-clad. A1 has landed and A2 is under way. This is what lets a seat
|
||||
start work with no human message, which is the north star's mechanism.
|
||||
3. **Gate E by the shortest path.** Every seat interactive from the
|
||||
Console, then Jason's workday ruling. CHAT-03 is rescoped to what Gate E
|
||||
needs, see below.
|
||||
4. **Retire the fleet (row 8).** On Jason's word, after Gate E.
|
||||
|
||||
## What changes now (lead decision 27)
|
||||
|
||||
- **CHAT-03.** Dewey finishes r3, because the findings describe real
|
||||
limits of pinned Pi that any design has to respect. After that, no
|
||||
source work starts until Sage rescopes CHAT-03 against Gate E. The
|
||||
default for anything pinned Pi can't prove is to refuse or report
|
||||
"unknown". Building more machinery to prove it isn't the default.
|
||||
- **Review budget.** A brief gets two review rounds. If blocking findings
|
||||
remain after round two, Sage cuts scope instead of opening a round
|
||||
three. The CHAT-03 r3 already in progress is the last exception.
|
||||
- **Other projects.** Work for another repository goes to that
|
||||
repository's own seats. The SetSpark deploy was handed to the
|
||||
shared-signals stack operator, not done by Sage.
|
||||
- **Weekly check.** Sage runs the ledger every Monday and records the
|
||||
number in QUEUE row 7's log.
|
||||
|
||||
## What Jason decides
|
||||
|
||||
1. Ratify or rewrite the north star sentence.
|
||||
2. Whether the goal order above matches the target he is preparing for
|
||||
the next phase.
|
||||
Reference in New Issue
Block a user