A project row's sessions, open tasks and needs-you figures come from
reads beyond the project list; when those failed in the row's
organization the cells now say not read instead of none or 0, and a
note names the organization. Dashboard per-organization figures and
Done this week count only organizations that made the tile's reads, a
dashboard with no answering organization shows no totals, and empty
lists say not read when no organization could make the read. Sessions
now names each session's organization for screen readers. The
org-archive test waits for the setup steps, which render after the
editor title.
open() waits only for the editor title; the setup step enables the bus run
button after its async /setup read. Under load the assert ran first and
failed (A1 final gate, 2 of 4 runs). Wait for the enabled button instead.
E2E5 review P2. An open Settings page kept Done after the bus died
because only opening the organization reread bus health. display.js
now announces each fresh list read, org-create.js redraws the setup
steps when the selected org's bus state flips (choices kept, no draft
guard), and app.js reads the list before bus-status so a failed
bus-status read no longer skips it. Regression: healthy, Refresh down
shows Start, Refresh up hides it; red on 8a8edc44b.
git mv packages/business -> packages/organization (@mosaic/organization). The
old package stays as one-line re-export shims of each moved module, with
src/business.mjs re-exporting src/organization-config.mjs and src/cli.mjs
forwarding to the moved executable. BusinessError is OrganizationConfigError
(one constructor, name kept BusinessError); OrganizationError stays distinct.
The bus adapter gains organization-context.mjs (busOrganization), with
business.mjs (busBusiness) as the same function.
Import consumers, manifests, the lockfile, scripts/mosaic, stack-copy.sh
COPY_PATHS (both roots), seat sandbox RUNNER_FILES and the copy closure
walker (organization-imports.mjs, both roots required) move to the new path.
v1 serialization, v1 writers and the stage A fixtures are unchanged; the stage
A contract tests stay where they were and pass as before.