Commit Graph
6 Commits
Author SHA1 Message Date
fred 146304d1b0 docs(ruling-4b): round-4 review fixes — rollback state predicate, join flow deferred
ci/woodpecker/pr/ci Pipeline was successful
- §6.4 rollback witness now requires no state effect on rollback (create
  leaves no row; rename/transfer/visibility change leave prior values;
  delete/revoke leave the row present) alongside no event and no outbox
  record — all three REQ-AUD-001 legs; §6.9 cross-ref mirrors it.
- §2.8 no longer authorizes a join-request runtime surface: the
  see-and-ask-to-join flow (Ruling 4b decision 5) is deferred in its
  entirety to its follow-up contract, with §2.8's invariants pre-binding
  it; A2 §9.2 gains the matching express exclusion (that contract must
  amend A2's enumeration before any join-request surface exists).
2026-08-28 14:58:35 -05:00
fred 9819666b9d docs(ruling-4b): round-3 review fixes — SOT Amendment A2, §6.4 outbox predicate
ci/woodpecker/pr/ci Pipeline was canceled
- native-kanban-sot.md gains §9 Amendment A2: expressly extends A1 §8.1.2
  (class data admits companies.visibility) and A1 §8.1.3 (company directory
  as an express, narrow read-only disclosure function; sole existence-oracle
  carve-out to §8.3), grounded on Ruling 4b. §9.2 pins what stays unchanged.
- hierarchy-schema.md §1.1 and the Amendment 1 note now cite A2 instead of
  reinterpreting A1; §6.7 acceptance cites A2 §9.1.2.
- §6.4 gains the explicit outbox predicate (state/event/outbox one
  transaction, rollback leaves neither event nor outbox record, REQ-AUD-001);
  §6.9's cross-reference corrected to match.
- §2.8: 'Ruling 4 §5.2' reference corrected to contract 3 §5.2.
2026-08-28 14:47:53 -05:00
fred 4b448109dd docs/prd: address independent review findings 1-10 (fidelity, A1 record class + carve-out, roadmap completeness)
ci/woodpecker/pr/ci Pipeline was successful
2026-08-25 23:20:40 -05:00
fred bc1149c15e docs: north-star PRD rewrite (D1-D14), ROADMAP.md, kanban SOT Amendment A1
ci/woodpecker/pr/ci Pipeline was successful
- docs/PRD.md: Part I product north star authored from ratified decisions
  D1-D14; Part II preserves all active workstream contracts verbatim
  (KBN-101, FCM #758, FCOM #766, TESS, #756, MOS-PORT, #1150, #1174, #1194,
  RI #1275, M1). Referenced anchors unchanged.
- docs/archive/PRD-v0.1.md: v0.1.0 beta PRD body archived verbatim with
  supersession header.
- docs/ROADMAP.md: all phases P0-P5 present from day one per D11
  (P2-P5 as explicit placeholders).
- docs/requirements/native-kanban-sot.md: Amendment A1 (D13) - hierarchy
  parentage + RBAC chain above workspaces; sections 1-7 untouched.
2026-08-25 22:23:07 -05:00
veronicaandfred a480ee83dc docs(W4): document contract — stamp kind and status on 104 live docs (#1350)
ci/woodpecker/push/publish Pipeline was canceled
Co-authored-by: veronica <[email protected]>
2026-08-21 14:07:36 +00:00
jason.woltje 49e8a54105 docs(#751): Publish native Kanban/SOT canon (#752)
ci/woodpecker/push/publish Pipeline was successful
ci/woodpecker/push/ci Pipeline was successful
2026-07-14 17:08:09 +00:00