Full mission status: open PRs (#543, #570), locked decisions, P0-P6 phase
status, drift re-grounding, and the step-by-step RESUME PROCEDURE.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Captures operator decisions (MIT, neutral persona, Pi internal, OpenBrain
soft-degrade), re-grounding vs current main (cred-fix simplified, launch.ts
anchors shifted, contamination=31), R1-R10 requirements, and the P0-P6 plan.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>