Commit Graph
8 Commits
Author SHA1 Message Date
code-infra-01 3b753a48a4 docs: T78 contract punctuation cleanup
ci/woodpecker/pr/ci Pipeline was successful
Removes prose semicolons outside code fences in the requirements
contract (list items end with periods, clause joins split into
sentences, M4 cell comma), replaces the em dash in the PRD T78
pointer with a colon, and normalizes the SITEMAP T78 line to colon
and plain punctuation. Fenced-code semicolons untouched; no wording
changes. Docs-only.
2026-08-26 20:57:12 -05:00
code-infra-01 5c83c89bae docs: remediate T78 CLI capability migration contract (review deltas)
Applies the docs-delta review dispositions: frontmatter and header flip to
active with implementation held by M0, merge-invariant authority statement,
PRD trunk-scoped contract label, SITEMAP qualifier swap, brain/fleet-comms
provenance scoping for the registry-freeze citations, and removal of the
four trailing-space hard breaks (ranged diff --check now clean). Docs-only.
2026-08-26 20:47:28 -05:00
code-infra-01 2a223767b3 docs: publish T78 CLI capability migration requirements (draft)
Adds docs/requirements/cli-capability-migration.md, the normative T78
contract copied from the frozen lane draft (brain dd34296) with lane
routing metadata normalized for the destination; requirement text, IDs,
stages, tables, implementation hold, and external provenance citations
preserved. Minimal pointers added in PRD Part II, ROADMAP parallel
tracks, and SITEMAP. Docs-only.
2026-08-26 20:29:50 -05:00
fred 2a30c68b84 docs: identity account-lifecycle contract (S2 contract 4) (#1433)
ci/woodpecker/push/publish Pipeline is running
2026-08-27 00:13:49 +00:00
fred 4b448109dd docs/prd: address independent review findings 1-10 (fidelity, A1 record class + carve-out, roadmap completeness)
ci/woodpecker/pr/ci Pipeline was successful
2026-08-25 23:20:40 -05:00
fred bc1149c15e docs: north-star PRD rewrite (D1-D14), ROADMAP.md, kanban SOT Amendment A1
ci/woodpecker/pr/ci Pipeline was successful
- docs/PRD.md: Part I product north star authored from ratified decisions
  D1-D14; Part II preserves all active workstream contracts verbatim
  (KBN-101, FCM #758, FCOM #766, TESS, #756, MOS-PORT, #1150, #1174, #1194,
  RI #1275, M1). Referenced anchors unchanged.
- docs/archive/PRD-v0.1.md: v0.1.0 beta PRD body archived verbatim with
  supersession header.
- docs/ROADMAP.md: all phases P0-P5 present from day one per D11
  (P2-P5 as explicit placeholders).
- docs/requirements/native-kanban-sot.md: Amendment A1 (D13) - hierarchy
  parentage + RBAC chain above workspaces; sections 1-7 untouched.
2026-08-25 22:23:07 -05:00
veronicaandfred a480ee83dc docs(W4): document contract — stamp kind and status on 104 live docs (#1350)
ci/woodpecker/push/publish Pipeline was canceled
Co-authored-by: veronica <[email protected]>
2026-08-21 14:07:36 +00:00
jason.woltje 49e8a54105 docs(#751): Publish native Kanban/SOT canon (#752)
ci/woodpecker/push/publish Pipeline was successful
ci/woodpecker/push/ci Pipeline was successful
2026-07-14 17:08:09 +00:00