Commit Graph

1 Commits

Author SHA1 Message Date
Jarvis
47aac682f5 docs(federation): PRD, milestones, mission manifest, and M1 task breakdown
All checks were successful
ci/woodpecker/push/ci Pipeline was successful
ci/woodpecker/pr/ci Pipeline was successful
Plans the Federation v1 mission: cross-instance data federation between
Mosaic Stack gateways with asymmetric trust (home gateway sees blended
A+B at session time; work gateway sees only its own tenants), mTLS via
X.509 / Step-CA for auth, multi-tenant RBAC with no cross-user leakage,
and no data persistence across the boundary.

- docs/federation/PRD.md — 16-section product requirements (v1 locked)
- docs/federation/MILESTONES.md — 7-milestone decomposition with
  per-milestone acceptance test tables across unit/integration/E2E layers
- docs/federation/MISSION-MANIFEST.md — mission scope, success criteria,
  milestone table linked to issues #460-#466
- docs/federation/TASKS.md — FED-M1 decomposed into 12 tasks; M2-M7
  deferred to per-milestone planning to avoid speculative decomposition

Refs: #460 #461 #462 #463 #464 #465 #466

Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>
2026-04-19 17:04:39 -05:00