Commit Graph
7 Commits
Author SHA1 Message Date
fred 6043b9ebff docs: api-artifacts contract revision 2 (luna review F1-F5)
ci/woodpecker/pr/ci Pipeline was canceled
F1: declared route-metadata layer as complete generator input; generator
fails closed on any route lacking extractable metadata; migration of
local-DTO/inline-typed/raw-handler routes named as implementing-PR scope.
F2: coverage closed over raw framework mounts, delegated surfaces,
tier-conditional controllers, SSE, and both-direction Socket.IO events;
explicit exclusion and delegation lists.
F3: ENDPOINTS.md structured entry format with operationId links; the
no-duplication rule reattributed as new disclosed policy with a
mechanical boundary witness.
F4: witnesses added for OpenAPI 3.1 validity, family coverage in
ENDPOINTS.md, per-entry required content, fail-closed generator control,
and a defined retirement equivalence algorithm.
F5: section 8 disclosure completed (10 items); Authority paragraph
restated in the sitemap's own terms.
2026-08-26 20:02:49 -05:00
fred f891f78e7b docs: API contract artifacts contract (S2 contract 9)
ci/woodpecker/pr/ci Pipeline was canceled
2026-08-26 19:45:03 -05:00
fred 2a30c68b84 docs: identity account-lifecycle contract (S2 contract 4) (#1433)
ci/woodpecker/push/publish Pipeline is running
2026-08-27 00:13:49 +00:00
fred 4b448109dd docs/prd: address independent review findings 1-10 (fidelity, A1 record class + carve-out, roadmap completeness)
ci/woodpecker/pr/ci Pipeline was successful
2026-08-25 23:20:40 -05:00
fred bc1149c15e docs: north-star PRD rewrite (D1-D14), ROADMAP.md, kanban SOT Amendment A1
ci/woodpecker/pr/ci Pipeline was successful
- docs/PRD.md: Part I product north star authored from ratified decisions
  D1-D14; Part II preserves all active workstream contracts verbatim
  (KBN-101, FCM #758, FCOM #766, TESS, #756, MOS-PORT, #1150, #1174, #1194,
  RI #1275, M1). Referenced anchors unchanged.
- docs/archive/PRD-v0.1.md: v0.1.0 beta PRD body archived verbatim with
  supersession header.
- docs/ROADMAP.md: all phases P0-P5 present from day one per D11
  (P2-P5 as explicit placeholders).
- docs/requirements/native-kanban-sot.md: Amendment A1 (D13) - hierarchy
  parentage + RBAC chain above workspaces; sections 1-7 untouched.
2026-08-25 22:23:07 -05:00
veronicaandfred a480ee83dc docs(W4): document contract — stamp kind and status on 104 live docs (#1350)
ci/woodpecker/push/publish Pipeline was canceled
Co-authored-by: veronica <[email protected]>
2026-08-21 14:07:36 +00:00
jason.woltje 49e8a54105 docs(#751): Publish native Kanban/SOT canon (#752)
ci/woodpecker/push/publish Pipeline was successful
ci/woodpecker/push/ci Pipeline was successful
2026-07-14 17:08:09 +00:00