Replace the install-ux-v2 manifest at docs/MISSION-MANIFEST.md with a
top-level MVP rollup that tracks workstream-level missions instead of
sub-mission scope. install-ux-v2 substantively shipped (IUV-M03 via
PR #446 + releases 0.0.27 → 0.0.29) and is archived under
docs/archive/missions/install-ux-v2-20260405/ with status corrected
to complete.
The new MVP manifest:
- Names federation v1 as workstream W1 (planning-complete, 7 milestones,
manifest at docs/federation/MISSION-MANIFEST.md, issues #460-#466)
- Encodes three-surface parity (webUI/TUI/CLI) as cross-cutting
requirement MVP-X1 so it cannot be silently dropped
- Pre-stages additional workstreams (PRD-derived candidates) without
committing execution capacity to them — scope creep is named and
accommodated, not denied
- Preserves Phase 0–8 history from sessions 1-14 in the scratchpad as
prior execution context, not as the active control plane
docs/TASKS.md becomes a rollup pointing at workstream task files;
workers operating inside W1 read docs/federation/TASKS.md as their
primary task source.
Session 15 entry appended to docs/scratchpads/mvp-20260312.md (the
existing scratchpad, active since 2026-03-13).
Co-Authored-By: Claude Opus 4.7 <noreply@anthropic.com>