Commit Graph

19 Commits

Author SHA1 Message Date
8be688bcdc chore(orchestrator): complete Phase 6 milestone — v0.0.7
All checks were successful
ci/woodpecker/pr/ci Pipeline was successful
ci/woodpecker/push/ci Pipeline was successful
- P6-001 done: CLI subcommands (PR #104)
- P6-002 done: prdy migration (PR #101)
- P6-003 done: quality-rails migration (PR #100)
- P6-004 done: mosaic wizard migration (PR #103)
- P6-006 done: verification passed
- BUG-1/BUG-2 fixed (PR #102)
- Phase 6 complete, advancing to Phase 7

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-14 20:06:45 -05:00
6e22c0fdeb chore(orchestrator): complete Phase 5 milestone — v0.0.6
All checks were successful
ci/woodpecker/push/ci Pipeline was successful
- P5-005 done: Telegram plugin wired, .env.example updated
- PR #99 merged, issue #45 closed
- Phase 5 complete, advancing to Phase 6

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-14 19:06:23 -05:00
1bfdc91f90 Merge pull request 'feat(auth): P5-004 Authentik OIDC adapter via Better Auth genericOAuth' (#97) from feat/p5-sso-authentik into main
Some checks failed
ci/woodpecker/push/ci Pipeline failed
2026-03-13 20:15:50 +00:00
684dbdc6a4 fix(gateway): enforce task and mission ownership
All checks were successful
ci/woodpecker/push/ci Pipeline was successful
ci/woodpecker/pr/ci Pipeline was successful
2026-03-13 14:43:33 -05:00
e92de12cf9 feat(auth): add Authentik OIDC adapter
All checks were successful
ci/woodpecker/push/ci Pipeline was successful
ci/woodpecker/pr/ci Pipeline was successful
Refs #96
2026-03-13 14:42:05 -05:00
54c6bfded0 fix(gateway): security hardening — auth guards, ownership checks, validation, rate limiting 2026-03-13 13:03:09 -05:00
ca5472bc31 chore: format docs files 2026-03-13 13:03:09 -05:00
01e9891243 Merge pull request 'feat(plugins): P5-003 Telegram channel plugin' (#93) from feat/p5-telegram-plugin into main
Some checks failed
ci/woodpecker/push/ci Pipeline failed
2026-03-13 17:48:01 +00:00
96902bab44 feat(plugins): add Telegram channel plugin
Some checks failed
ci/woodpecker/push/ci Pipeline failed
ci/woodpecker/pr/ci Pipeline failed
2026-03-13 12:05:42 -05:00
280c5351e2 feat(gateway): add plugin host module
Some checks failed
ci/woodpecker/push/ci Pipeline failed
ci/woodpecker/pr/ci Pipeline was successful
2026-03-13 12:04:42 -05:00
9eb48e1d9b feat(Phase 4): Memory & Intelligence — memory, log, summarization, skills (#91)
Co-authored-by: Jason Woltje <jason@diversecanvas.com>
Co-committed-by: Jason Woltje <jason@diversecanvas.com>
2026-03-13 13:56:50 +00:00
d83ebe65e9 verify(P3-008): Phase 3 web dashboard verification (#90)
Co-authored-by: Jason Woltje <jason@diversecanvas.com>
Co-committed-by: Jason Woltje <jason@diversecanvas.com>
2026-03-13 13:37:43 +00:00
b03c603759 docs: mark Phase 2 complete — update manifest and scratchpad
Phase 0-2 all done. P2-007 closed via PR #79. Mission advances to Phase 3.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-12 22:40:59 -05:00
2b1723e898 feat(db): @mosaic/db — Drizzle schema, PG connection, migrations (#67)
Co-authored-by: Jason Woltje <jason@diversecanvas.com>
Co-committed-by: Jason Woltje <jason@diversecanvas.com>
2026-03-13 02:17:18 +00:00
bf2cb3a271 docs: mark P0-002, P0-005, P0-006 done (PR #65)
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-12 20:56:16 -05:00
04528459ec docs: update TASKS.md and scratchpad for communication spine completion
Mark P1-001, P1-007, P1-008, P2-001, P5-002, P6-005 as done (PR #61).
Add session 2 log entry for vertical slice delivery.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-12 20:34:26 -05:00
6d0d288e31 feat(P0-001): scaffold monorepo structure (#60)
Co-authored-by: Jason Woltje <jason@diversecanvas.com>
Co-committed-by: Jason Woltje <jason@diversecanvas.com>
2026-03-13 01:11:46 +00:00
339641352e docs: record vertical slice reorder in scratchpad
Jason directed: build Pi TUI → Gateway → Discord communication
spine before backfilling horizontal layers.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-12 20:06:17 -05:00
e7f338e3a9 chore: planning gate — milestones, issues, and task breakdown
Break PRD into 8 milestones (Phase 0–7) with 59 issues on Gitea.
Populate TASKS.md, update mission manifest, initialize scratchpad.
Repo created at git.mosaicstack.dev/mosaic/mosaic-stack.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-12 19:51:51 -05:00