Commit Graph
2 Commits
Author SHA1 Message Date
ops-01 b01950e92f merge: absorb main into next — 23-commit divergence (08-05..13 base=main window)
ci/woodpecker/pr/ci Pipeline failed
17 content commits + 3 merge bubbles were genuinely missing from next (~8,000 lines:
goal controller #1152, framework enforcement #1174/#1195, pr-edit wrapper #1173/#1200,
pipefail series #1100/#1105/#1106/#1107, git-tools fixes #1073/#1085/#1086/#1089,
#991, #1007, enrollment tolerance #1094). 3 commits were already in next by content
(#1060 identical, #1066/#1062 evolved twins — conflicts resolved to next's side).

Per-commit classification and evidence: mosaic-brain fleet/lanes/stack-remediation/main-next-divergence.md.
Conflict resolutions (6 files) itemized in the PR body.
2026-08-19 16:27:17 -05:00
mos-dt-0 7a6fb024b4 docs: establish canonical documentation architecture (#1210)
ci/woodpecker/push/publish Pipeline failed
2026-08-13 17:56:13 +00:00