Commit Graph
13 Commits
Author SHA1 Message Date
fred c6a2237dde docs: custody-schema contract revision 9 (sol r8 F15 residual + F16: independent deadline supervisor, brain fence via conditional application, reservation-at-skip, computed fixed cycle maximum with explicit exceedance carry-over)
ci/woodpecker/pr/ci Pipeline was successful
2026-08-27 02:22:17 -05:00
fred f8ac64f58a docs: custody-schema contract revision 8 (sol r7 residual F15: declared hold deadline + arrival-order grants make the one-cycle bound wall-clock provable)
ci/woodpecker/pr/ci Pipeline was successful
2026-08-26 23:08:12 -05:00
fred 482400d93c docs: custody-schema contract revision 7 (sol r6 F15: within-cycle blocking retry preserves the one-cycle orphan bound under lock contention)
ci/woodpecker/pr/ci Pipeline failed
2026-08-26 22:38:20 -05:00
fred 8ca4564b5e docs: custody-schema contract revision 6 (sol r5 residuals F9/F12 + F14)
ci/woodpecker/pr/ci Pipeline was successful
2026-08-26 22:06:00 -05:00
fred a8111998c7 docs: custody-schema contract revision 5 (sol r4 residuals F9/F11 + F12/F13)
ci/woodpecker/pr/ci Pipeline failed
2026-08-26 21:25:53 -05:00
fred 269aeda193 docs: custody-schema contract revision 4 (sol r3 residuals F1/F2/F4/F6/F7/F9 + F10/F11)
ci/woodpecker/pr/ci Pipeline failed
2026-08-26 21:02:12 -05:00
fred 671b872ec9 docs: custody-schema contract revision 3 (sol re-review residuals F1-F9)
ci/woodpecker/pr/ci Pipeline was successful
2026-08-26 20:33:21 -05:00
fred 8079d8dc91 docs(custody): revision 2 — classifier registry, grantee model, exact schemas, witness closure (sol r1 F1-F6)
ci/woodpecker/pr/ci Pipeline is running
2026-08-26 19:39:04 -05:00
fred caa5b04096 docs: custody pointer and consent schema contract (S2 contract 7)
ci/woodpecker/pr/ci Pipeline is running
2026-08-26 19:10:12 -05:00
fred 4b448109dd docs/prd: address independent review findings 1-10 (fidelity, A1 record class + carve-out, roadmap completeness)
ci/woodpecker/pr/ci Pipeline was successful
2026-08-25 23:20:40 -05:00
fred bc1149c15e docs: north-star PRD rewrite (D1-D14), ROADMAP.md, kanban SOT Amendment A1
ci/woodpecker/pr/ci Pipeline was successful
- docs/PRD.md: Part I product north star authored from ratified decisions
  D1-D14; Part II preserves all active workstream contracts verbatim
  (KBN-101, FCM #758, FCOM #766, TESS, #756, MOS-PORT, #1150, #1174, #1194,
  RI #1275, M1). Referenced anchors unchanged.
- docs/archive/PRD-v0.1.md: v0.1.0 beta PRD body archived verbatim with
  supersession header.
- docs/ROADMAP.md: all phases P0-P5 present from day one per D11
  (P2-P5 as explicit placeholders).
- docs/requirements/native-kanban-sot.md: Amendment A1 (D13) - hierarchy
  parentage + RBAC chain above workspaces; sections 1-7 untouched.
2026-08-25 22:23:07 -05:00
veronicaandfred a480ee83dc docs(W4): document contract — stamp kind and status on 104 live docs (#1350)
ci/woodpecker/push/publish Pipeline was canceled
Co-authored-by: veronica <[email protected]>
2026-08-21 14:07:36 +00:00
jason.woltje 49e8a54105 docs(#751): Publish native Kanban/SOT canon (#752)
ci/woodpecker/push/publish Pipeline was successful
ci/woodpecker/push/ci Pipeline was successful
2026-07-14 17:08:09 +00:00