Author SHA1 Message Date
GhostfredGhost <>
e9485c3d96 docs(l0): parameterize hard gates on the project's integration trunk (#1216, Option A) (#1217)
ci/woodpecker/push/publish Pipeline was successful
Co-authored-by: Ghost <>
2026-08-20 18:38:18 +00:00
jason.woltje 6d0d288e31 feat(P0-001): scaffold monorepo structure (#60)
Co-authored-by: Jason Woltje <[email protected]>
Co-committed-by: Jason Woltje <[email protected]>
2026-03-13 01:11:46 +00:00
jason.woltjeandClaude Opus 4.6 e7f338e3a9 chore: planning gate — milestones, issues, and task breakdown
Break PRD into 8 milestones (Phase 0–7) with 59 issues on Gitea.
Populate TASKS.md, update mission manifest, initialize scratchpad.
Repo created at git.mosaicstack.dev/mosaic/mosaic-stack.

Co-Authored-By: Claude Opus 4.6 <[email protected]>
2026-03-12 19:51:51 -05:00