M4-W-001: recorded #740 MERGED (b7b0f508) -> W-001 reachability spine now 3-of-3 merged (#737e2376190 + #7393378b857 + #740b7b0f508). Row stays in-progress -- TESS-M4-V re-fire is the gate and is Mos-owned. Flagged main push pipeline 1772 build-step failure (quality gates green; downstream build/publish). Noted prior ledger PR #741 merged f40e6ba3.
M5-002: not-started -> in-progress. PR #742 (4 new M5-MIGRATION docs) CI 1773 green, reviewer VERIFIED APPROVE (Gitea 17108) at head b5e9d0e528, mergeable -- HARD STOP for Mos merge.
M5-001: not-started -> in-progress. coder0 Matrix/native provider in TDD, no PR yet.
Scope / safety
Docs-only: 3 rows in docs/tess/TASKS.md; no code, no product files.
M4 status preserved as in-progress / gate-pending (does not assert M4-V passed).
command-authz untouched (byte-identical a9f829e7); no secrets.
Requesting independent non-author reviewer-of-record; no self-merge (Mos owns merge).
Consolidated post-#741-merge ledger sync (docs-only, tracking ledger docs/tess/TASKS.md).
## What changed
- M4-W-001: recorded #740 MERGED (b7b0f508) -> W-001 reachability spine now 3-of-3 merged (#737 e2376190 + #739 3378b857 + #740 b7b0f508). Row stays in-progress -- TESS-M4-V re-fire is the gate and is Mos-owned. Flagged main push pipeline 1772 build-step failure (quality gates green; downstream build/publish). Noted prior ledger PR #741 merged f40e6ba3.
- M5-002: not-started -> in-progress. PR #742 (4 new M5-MIGRATION docs) CI 1773 green, reviewer VERIFIED APPROVE (Gitea 17108) at head b5e9d0e528a5, mergeable -- HARD STOP for Mos merge.
- M5-001: not-started -> in-progress. coder0 Matrix/native provider in TDD, no PR yet.
## Scope / safety
- Docs-only: 3 rows in docs/tess/TASKS.md; no code, no product files.
- M4 status preserved as in-progress / gate-pending (does not assert M4-V passed).
- command-authz untouched (byte-identical a9f829e7); no secrets.
Requesting independent non-author reviewer-of-record; no self-merge (Mos owns merge).
VERIFIED APPROVE reviewer-of-record [W-jarvis:reviewer] head aa3925510d
Reviewed exact head aa3925510d060894ca21f5393bb1f5ba773e00ac; Woodpecker pipeline 1775 is SUCCESS for that commit.
Findings:
Docs-only delta: single file docs/tess/TASKS.md; no code/product files touched.
The three changed rows match the stated ledger sync: M4-W-001 records #740 merged at b7b0f508 and W-001 spine 3-of-3 merged; M5-002 records #742 CI/ROR facts; M5-001 moves into TDD/in-progress.
M4 remains conservative/gate-pending: TESS-M4-W-001 is still in-progress, TESS-M4-V remains failed, and there is no false M4 done / M4-V passed claim.
apps/gateway/src/commands/command-authorization.service.ts is byte-identical to main, hash a9f829e7ecec721c6c585fe0da56fb5d6a6441e9; no live credentials found.
No merge performed by reviewer.
Marker: ROR-743-VERIFIED-APPROVE-aa392551
VERIFIED APPROVE reviewer-of-record [W-jarvis:reviewer] head aa3925510d060894ca21f5393bb1f5ba773e00ac
Reviewed exact head `aa3925510d060894ca21f5393bb1f5ba773e00ac`; Woodpecker pipeline `1775` is SUCCESS for that commit.
Findings:
- Docs-only delta: single file `docs/tess/TASKS.md`; no code/product files touched.
- The three changed rows match the stated ledger sync: M4-W-001 records #740 merged at `b7b0f508` and W-001 spine 3-of-3 merged; M5-002 records #742 CI/ROR facts; M5-001 moves into TDD/in-progress.
- M4 remains conservative/gate-pending: `TESS-M4-W-001` is still `in-progress`, `TESS-M4-V` remains `failed`, and there is no false M4 done / M4-V passed claim.
- `apps/gateway/src/commands/command-authorization.service.ts` is byte-identical to main, hash `a9f829e7ecec721c6c585fe0da56fb5d6a6441e9`; no live credentials found.
No merge performed by reviewer.
Marker: ROR-743-VERIFIED-APPROVE-aa392551
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
Consolidated post-#741-merge ledger sync (docs-only, tracking ledger docs/tess/TASKS.md).
What changed
b7b0f508) -> W-001 reachability spine now 3-of-3 merged (#737e2376190+ #7393378b857+ #740b7b0f508). Row stays in-progress -- TESS-M4-V re-fire is the gate and is Mos-owned. Flagged main push pipeline 1772 build-step failure (quality gates green; downstream build/publish). Noted prior ledger PR #741 mergedf40e6ba3.b5e9d0e528, mergeable -- HARD STOP for Mos merge.Scope / safety
a9f829e7); no secrets.Requesting independent non-author reviewer-of-record; no self-merge (Mos owns merge).
VERIFIED APPROVE reviewer-of-record [W-jarvis:reviewer] head
aa3925510dReviewed exact head
aa3925510d060894ca21f5393bb1f5ba773e00ac; Woodpecker pipeline1775is SUCCESS for that commit.Findings:
docs/tess/TASKS.md; no code/product files touched.b7b0f508and W-001 spine 3-of-3 merged; M5-002 records #742 CI/ROR facts; M5-001 moves into TDD/in-progress.TESS-M4-W-001is stillin-progress,TESS-M4-Vremainsfailed, and there is no false M4 done / M4-V passed claim.apps/gateway/src/commands/command-authorization.service.tsis byte-identical to main, hasha9f829e7ecec721c6c585fe0da56fb5d6a6441e9; no live credentials found.No merge performed by reviewer.
Marker: ROR-743-VERIFIED-APPROVE-aa392551