# CI Queue Guard Purpose Semantics
- **Issue:** #1146
- **Target branch:** `next`
## Problem
`ci-queue-wait.sh` treats any result other than terminal success as asserted non-readiness. That is correct for merge readiness, but incorrect for the pre-push queue guard: a terminal failure or an empty status set means no pipeline is queued or running, so the queue is clear.
## Design
Make final-state handling purpose-sensitive while preserving the existing provider and payload safeguards:
- `--purpose push`
- wait while state is `pending`;
- return success for `terminal-success`, `terminal-failure`, and `no-status`;
- continue rejecting `malformed`, `unknown`, and unrecognized states.
- `--purpose merge`
- return success only for `terminal-success`;
- continue rejecting `terminal-failure`, `no-status`, malformed, unknown, and unrecognized states.
- `--require-status` remains authoritative: `no-status` fails for either purpose when it is supplied.
Diagnostics will explicitly distinguish a queue-clear push result from successful CI so callers cannot mistake an old failure for a green pipeline.
## Testing
Extend the process-level tri-state regression harness with separate push and merge assertions:
1. Push passes for terminal success, terminal failure, and no status.
2. Push still fails for pending, malformed, and unknown states.
3. `--require-status` makes push/no-status fail.
4. Merge behavior remains fail-closed except for terminal success.
5. Existing provider-unavailable audit behavior remains unchanged.
+43
View File
@@ -0,0 +1,43 @@
# #1146 — CI Queue Guard Purpose Semantics
## Objective
Make the pre-push queue guard wait for queued/running CI without requiring the previous remote head to have successful CI. Preserve fail-closed merge readiness.
## Scope
- `packages/mosaic/framework/tools/git/ci-queue-wait.sh`
- focused queue-guard regression tests
- design and scratchpad documentation
- local framework activation required before the fixed guard can authorize this branch's push
## Plan
1. Freeze purpose-specific behavior in failing process-level tests.
2. Implement the smallest state-dispatch change.
3. Run focused shell tests and repository quality gates.
4. Obtain independent review and remediate findings.
5. Install the reviewed framework source locally, run the mandatory pre-push queue guard, and push.
6. Open a PR against `next`, verify terminal-green CI, and close #1146 after merge.
## Budget
- ASSUMPTION: no explicit token cap was provided.
- Working estimate: 12K tokens.
- Scope reduction: change only final-state dispatch and focused tests; do not redesign provider adapters.
## Progress
- Confirmed source and installed guards are byte-identical.
- Reproduced `terminal-failure` blocking `--purpose push`.
- Root cause: final-state dispatch requires terminal success for both push and merge.
- Design approved: push is queue-clear on valid non-pending states; merge remains fail-closed.
## Tests
Pending.
## Risks and Blockers
- A source-only fix does not update `~/.config/mosaic/tools/git/ci-queue-wait.sh`; local framework activation must use the reviewed installer path rather than a manual copy.
- Existing `.mosaic/orchestrator/*` working-tree changes are unrelated and must remain unstaged.