# CURRENT — single source of "what happens next" This file always names exactly one next action. Any "continue" / "next" / "proceed" message means: execute the action below, fully (implement → test → verify against its acceptance criteria → commit → push → close the issue → update this file to the next action). No ambiguity, no re-planning. ## Next action Gitea issue: (none queued — awaiting owner direction) ## Queue (ordered, not started) 1. Owner review of M5–M7 (workspaces, capabilities, sessions) — hands-on 2. M8 candidate: mission-level capability policy (defaults per mission) 3. M9 candidate: run-record retention + `retry ` convenience ## Rules - One action in flight. Update this file at the END of every action. - Blocked? Move the item to "Blocked" below with the reason and stop. - Completed actions move to the log at the bottom (date + issue + result). ## Blocked (none) ## Completed log - 2026-09-03 — M5 workspaces + capability envelope (#20, #21) — merged, tests green - 2026-09-03 — M6 named sessions + resume (#22, #23) — merged, teach/recall verified - 2026-09-03 — M7 run inspection + release 0.0.6 (#24) — merged, activated