# CURRENT — single source of "what happens next" This file always names exactly one next action. Any "continue" / "next" / "proceed" message means: execute the action below, fully (implement → test → verify against its acceptance criteria → commit → push → close the issue → update this file to the next action). No ambiguity, no re-planning. ## Next action Owner review of M11 (session forking) — then name the next target. ## Queue (ordered, not started) 1. Second real adapter (parked — owner focused on Pi) 2. Auto-apply policy for worker patches (substrate exists) 3. UX/DX backlog #31 (grep highlight vs status colors — likely closed by owner's unalias) ## Rules - One action in flight. Update this file at the END of every action. - Blocked? Move the item to "Blocked" below with the reason and stop. - Completed actions move to the log at the bottom (date + issue + result). ## Blocked (none) ## Completed log - 2026-09-03 — M9 mission capability policy (#30) — merged, least-privilege intersection - 2026-09-03 — test UX: green OK/red FAIL status colors (#31 adjacent) — terminal-only, pipe-safe - 2026-09-03 — M10 run-record retention (#32) — merged, prune keep-N/dry-run/receipt, 49/24/14 + verify green - 2026-09-03 — M11 session forking (#33) — merged, child recalls ancestor context, ancestor untouched, 58/24/14 + verify green; release 0.0.7 activated - 2026-09-03 — M9 mission capability policy (#30) — merged, least-privilege intersection - 2026-09-03 — test UX: green OK/red FAIL status colors (#31 adjacent) — terminal-only, pipe-safe - 2026-09-03 — M10 run-record retention (#32) — merged, prune keep-N/dry-run/receipt, 49/24/14 + verify green - 2026-09-03 — M5 workspaces + capability envelope (#20, #21) — merged, tests green - 2026-09-03 — M6 named sessions + resume (#22, #23) — merged, teach/recall verified - 2026-09-03 — M7 run inspection + release 0.0.6 (#24) — merged, activated - 2026-09-03 — M8 conductor loop + worker-built retry (#25, #26, #27) — merged; worker authored retry in 2 refinement rounds, conductor fixed a 3-line interpolation rename; live retry verified - 2026-09-03 — retry lineage + relative mission resolution (#28) — merged, 36/24/14 suites + verify green - 2026-09-03 — M9 mission capability policy (#30) — merged, least-privilege intersection, 41/36/14 + verify green - 2026-09-03 — M8 conductor loop + worker-built retry (#25, #26, #27) — merged; worker authored retry in 2 refinement rounds, conductor fixed a 3-line interpolation rename; live retry verified - 2026-09-03 — retry lineage + relative mission resolution (#28) — merged, 36/24/14 suites + verify green - 2026-09-03 — M8 conductor loop + worker-built retry (#25, #26, #27) — merged; worker authored retry in 2 refinement rounds, conductor fixed a 3-line interpolation rename; live retry verified