# QUEUE — the one task list Read this first. One row per piece. Nobody needs to read the prose plans to know what is next; the Brief column says which section to open only when you are the owner of that row. How to find your next thing: - **Jason**: the first row whose State starts with `Jason:`. - **A seat**: the first row where Owner is you and State is `in progress`, `in review` or `briefed`. If there is none, you have nothing; say so on the board and stop. - **Coordinator (Claude session)**: update this table at every gate, before anything else is written. CURRENT.md is the narrative log; this table wins if they disagree. States: `queued` (no brief yet) → `briefed` (brief written, not started) → `in progress` → `in review` → `Jason: ` → `done`. `parked` means not before the rows above it and not without Jason's say. `required` means it cannot be parked or reordered below `queued` rows; only Jason moves it. Brief locations: "plan page" is `docs/plans/2026-09-12_control-board-mvp.md`. Gaps found while working go to `docs/plans/DEFERRED.md`, not here. ## Pieces (in order) | # | Piece | Owner | Issue | State | Gate | Brief | |---|-------|-------|-------|-------|------|-------| | 1 | Control board MVP (scanner + page) | darkwing | #1503 | Jason: rule whether the page answers "who is waiting on me" without a terminal; then close #1503 and mark MOSAIC-STACK-D-001 completed | A passed 2026-09-12 | plan page, top | | 2 | Seat registration and `mosaic seat task` | darkwing | #1504 | done 2026-09-13 | B passed 2026-09-12 | plan page, Step 3 | | 3 | Reply-from-board (piece 2 on the plan page) | darkwing | #1505 | done 2026-09-12 | C passed 2026-09-12 | plan page, "Piece 2: reply-from-board" | | 4 | Ledger (piece 3 on the plan page) | darkwing | #1506 | done 2026-09-13 | D: 18.9 human messages per closed issue, week of 2026-09-06 | plan page, "Piece 3: ledger" | | 5 | WebUI first screen on the Console design (piece 4 on the plan page) | dewey; filbert reviews | #1507 | Jason: use WebUI Monday and give Gate E ruling; ea00ec66 published, Filbert approved, committed-tree 208/208 | E: Jason works Monday 2026-09-14 from the WebUI without the terminal | plan page, "Piece 4: WebUI first screen (Console)" | | 6 | Darkwing on point: darkwing assigns and gates filbert's work (piece 5 on the plan page) | darkwing | none yet | briefed; Jason: send the start message from the board on Sunday 2026-09-13 | F: filbert's item closes with zero human messages from Jason | plan page, "Piece 5: darkwing on point" | | 7 | Weekly ledger run and rails number | Jason | — | recurring, end of Monday 2026-09-14 | under 10 human messages per closed issue for the week of 2026-09-13 | `packages/ledger/README.md` | | 8 | Fleet seats (`~/.mosaic`) onto `mosaic launch` | unassigned | — | queued; not before row 6 is done | Jason's call | none yet | | 9 | Queue as data: `docs/plans/queue.json`, `mosaic queue` is the only writer | darkwing; filbert reviews | #1508 | required; starts when row 6 is done, before row 8 | G: a fresh seat told only "run `mosaic queue next` and do it" starts its piece with zero human messages | `2026-09-13_queue-as-data.md`, Piece A | | 10 | Seats read the queue, not CURRENT.md (AGENTS.md cadence, seat context files) | coordinator | #1508 | required; AGENTS.md lines done 2026-09-13, rest after row 9 | verified by Gate G | `2026-09-13_queue-as-data.md`, Piece B | | 11 | Brief template `docs/plans/BRIEF-TEMPLATE.md`; `queue add` refuses a missing brief | darkwing | #1508 | required; with row 9 | two briefs accepted by Jason with no scope question | `2026-09-13_queue-as-data.md`, Piece C | | 12 | Reviews as issue comments posted by `queue move ID in-review`, not files in `docs/plans/reviews/` | darkwing | #1508 | required; after row 9 | one review round with no new file under reviews/ | `2026-09-13_queue-as-data.md`, Piece D | | 13 | Ledger "queue" section: issue/row/seat drift printed with the weekly number | darkwing; filbert reviews | #1508 | required; after row 9 | first run Monday 2026-09-21, zero violations or every one moved same day | `2026-09-13_queue-as-data.md`, Piece E | | 14 | Discord connector pilot: Sage answers in Shared Signals (chat only, no tools, no repo writes) | coordinator; Filbert or orch-01 seat reviews | #1509 | done: rev-code-02 APPROVE 26170 (round 9), committed 786e379c; pilot steps 1-8 done with private receipts, Gate H passed (Jason, 2026-09-13: replies read as Sage); connector left running for MVP iteration | H: offline suite green, eight-step live pilot with private receipts, then Jason says the reply reads as Sage | `2026-09-13_discord-connector-pilot.md` | Start message for row 6, sent from the board to darkwing: "Read docs/plans/QUEUE.md, then the plan page section "Piece 5: darkwing on point", and execute it. Start with the first assignment for filbert. Report at Gate F or when blocked." ## Parked (not in order, needs Jason to reopen) | Item | Why parked | Where | |------|------------|-------| | Registry increment 3 (headless identity-env leak) | #1500 closed on increment 2; Jason has not asked for 3 | CURRENT.md, "#1500 increment 2 (historical)" | | Auth/provider/harness registry review | Paused for owner alignment | `docs/plans/2026-09-03_auth-provider-harness-registry.md` | | CI runners, second real adapter, push automation | Deferred by owner 2026-09-03 | `docs/plans/ROADMAP.md`, "Explicitly deferred" | | Console screens beyond the first (launch, observe, stop, transcript, palette) | Needs a new brief after Gate E | DEFERRED.md | | Open gaps from the MVP work | Fixed only when a gate needs them | DEFERRED.md, "Open" | ## Log of table changes - 2026-09-13 — created; rows 1 to 8 taken from CURRENT.md, DEFERRED.md and the plan page. - 2026-09-13 — rows 9 to 13 added (#1508): the process itself becomes data with one writer and ledger checks. Jason: "I want this iron-clad." Required, not parked; rule: these rows cannot be moved to parked, only to done. - 2026-09-13 — dewey: WebUI row advanced to Jason-owned Gate E after Filbert approval, exact committed-tree 208/208 and remote-verified ea00ec66 publication. No other row changed. - 2026-09-13 — rows 9 to 13 now point at the plan page `2026-09-13_queue-as-data.md` (pieces A to E, Gate G). - 2026-09-13 — coordinator: row 14 added (Discord connector pilot for Sage on Shared Signals), briefed, unassigned, waiting on Jason for decisions D1-D7. No other row changed. - 2026-09-13 — coordinator: row 14 moved to in progress (#1509) after Jason ruled Q1-Q27 through ms-grill-me. No other row changed. - 2026-09-13 — coordinator: row 14 moved to in review; package, suite, wrapper, DISCORD-USER.md draft and README written, offline and existing suites green. No other row changed. - 2026-09-13 — coordinator: row 14 stays in review; rev-code-02 round two findings (26121) fixed, round three requested. No other row changed. - 2026-09-13 — coordinator: row 14 stays in review; rev-code-02 round three finding (26123, stale reclaim race) fixed by failing closed plus `unlock`, round four requested. No other row changed. - 2026-09-13 — coordinator: row 14 stays in review; rev-code-02 round four finding (26132, unlock restore race) fixed with a `STOP` quiescence gate, round five requested. No other row changed. - 2026-09-13 — coordinator: row 14 stays in review; rev-code-02 round five findings (26150, boot identity and unlock wording) fixed, round six requested. No other row changed. - 2026-09-13 — coordinator: row 14 stays in review; rev-code-02 round six finding (26158, legacy record and unreadable record must refuse) fixed, round seven requested. No other row changed. - 2026-09-13 — coordinator: row 14 stays in review; rev-code-02 round seven finding (26165, malformed identity strings must refuse) fixed, round eight requested. No other row changed. - 2026-09-13 — coordinator: row 14 stays in review; rev-code-02 round eight finding (26168, noncanonical start digits must refuse) fixed, round nine requested. No other row changed. - 2026-09-13 — coordinator: row 14 moved to in pilot; approved 26170, committed 786e379c (no push), check passed, connector running. No other row changed. - 2026-09-13 — coordinator: row 14 done; Gate H passed, Jason ruled the replies read as Sage. Connector stays up; MVP improvements come as new rows. No other row changed.