# Mission Scratchpad — MVP > Append-only log. NEVER delete entries. NEVER overwrite sections. > This is the orchestrator's working memory across sessions. ## Original Mission Prompt ``` Active mission detected: MVP. Read the mission state files and report status. User confirmed: start the planning gate. ``` ## Planning Decisions ### 2026-03-13 — Milestone and task breakdown - PRD defines 8 phases (Phase 0–7), mapped 1:1 to Gitea milestones - 59 issues created on git.mosaicstack.dev/mosaic/mosaic-stack (#1–#59) - Each phase has a verification task as the final issue - Task IDs use P{phase}-{seq} format (P0-001 through P7-008) - Repo created as `mosaic/mosaic-stack` (private) on Gitea - Milestones: ms-157 (Phase 0) through ms-164 (Phase 7) - Total: 59 tasks across 8 milestones ### Phase structure | Phase | Version | Tasks | Focus | | ----- | ------- | ----- | ---------------------------------------------------------- | | 0 | v0.0.1 | 9 | Foundation — monorepo, types, db, auth, OTEL, Docker, CI | | 1 | v0.0.2 | 9 | Core API — gateway, brain, queue, routes, WebSocket | | 2 | v0.0.3 | 7 | Agent Layer — Pi SDK, multi-provider, routing, coord | | 3 | v0.0.4 | 8 | Web Dashboard — Next.js, chat, tasks, projects, admin | | 4 | v0.0.5 | 7 | Memory & Intelligence — memory, log, summarization, skills | | 5 | v0.0.6 | 5 | Remote Control — Discord, Telegram, SSO | | 6 | v0.0.7 | 6 | CLI & Tools — CLI, prdy, quality-rails, installer, TUI | | 7 | v0.1.0 | 8 | Polish & Beta — MCP, providers, E2E, docs, release | ## Session Log | Session | Date | Milestone | Tasks Done | Outcome | | ------- | ---------- | -------------- | ---------------------------------------------- | ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- | | 1 | 2026-03-13 | Planning | Planning gate | Milestones created, 59 issues created, TASKS.md populated, manifest updated | | 2 | 2026-03-13 | Vertical slice | P1-001, P1-007, P1-008, P2-001, P5-002, P6-005 | Communication spine built and merged (PR #61). Gateway + TUI + Discord. 3-agent gatekeeper review, 10/16 issues remediated, 4 deferred. | | 3 | 2026-03-13 | Foundation | P0-002, P0-005, P0-006 | Foundation layer merged (PR #65). Docker Compose (PG+pgvector, Valkey, OTEL Collector, Jaeger), OTEL auto-instrumentation in gateway, @mosaic/types with DTOs + Socket.IO typed event maps. | ## Open Questions (none at this time) ## Corrections ### 2026-03-13 — Vertical slice reorder (Jason directed) **Original plan:** Linear Phase 0 → 1 → 2 → ... execution. **Correction:** Vertical slice first. Scaffold monorepo, then build the Pi TUI → Gateway → Discord communication spine end-to-end before backfilling auth, brain, memory, CRUD, etc. **Why:** Validate the architecture's core message flow before investing in horizontal layers. If the communication channels don't work, nothing else matters. **Revised execution sequence:** | Step | Tasks (cross-phase) | What it proves | | ---- | -------------------------------------------------------------------- | ------------------------ | | 1 | P0-001: Scaffold monorepo | Build system works | | 2 | P0-005: Docker Compose (PG + Valkey) | Infrastructure runs | | 3 | P0-002: @mosaic/types (minimal — gateway, agent, chat types) | Shared contracts | | 4 | P1-001: Gateway scaffold (minimal NestJS + Fastify) | API surface boots | | 5 | P1-007: WebSocket server (chat streaming) | Real-time channel works | | 6 | P1-008: Basic agent dispatch (single provider) | LLM responds | | 7 | P2-001: @mosaic/agent — Pi SDK integration (minimal) | Pi sessions work | | 8 | P6-005: Pi TUI integration (mosaic tui → gateway) | TUI ↔ Gateway proven | | 9 | P5-001: Plugin host (channel plugin interface) | Plugin arch works | | 10 | P5-002: Discord plugin (bot + channel) | Discord ↔ Gateway proven | | — | Then backfill: auth, brain, db, queue, OTEL, CI, web dashboard, etc. |