Files
stack/docs/reports
ops-01 b01950e92f
ci/woodpecker/pr/ci Pipeline failed
merge: absorb main into next — 23-commit divergence (08-05..13 base=main window)
17 content commits + 3 merge bubbles were genuinely missing from next (~8,000 lines:
goal controller #1152, framework enforcement #1174/#1195, pr-edit wrapper #1173/#1200,
pipefail series #1100/#1105/#1106/#1107, git-tools fixes #1073/#1085/#1086/#1089,
#991, #1007, enrollment tolerance #1094). 3 commits were already in next by content
(#1060 identical, #1066/#1062 evolved twins — conflicts resolved to next's side).

Per-commit classification and evidence: mosaic-brain fleet/lanes/stack-remediation/main-next-divergence.md.
Conflict resolutions (6 files) itemized in the PR body.
2026-08-19 16:27:17 -05:00
..
2026-07-14 20:26:15 +00:00

Documentation Reports

Status: Current evidence index. Reports record reviews, tests, audits, and deferred findings; they are not requirements or operational instructions by themselves.

Use the canonical guide, API contract, source, and tests to determine current behavior. A report retains the scope and verdict of its original review unless a later report explicitly supersedes it.

Documentation evidence

Code-review evidence

Security evidence

QA evidence

Native Kanban/SOT evidence

These reports preserve the review sequence for issue #751. Their GO verdicts apply only to the reviewed historical scope and do not decide current Kanban authority or authorize held KBN-101 database work.

Retention rules

  • Preserve report wording and verdicts when migrating historical evidence.
  • Keep the reviewed commit, issue, scope, and date visible when present.
  • Do not treat an old approval as approval of later code.
  • Link each tracked report from this index or an explicitly scoped child index.
  • Put current operator procedures in the administrator guide, not in reports.