Mark P1-001, P1-007, P1-008, P2-001, P5-002, P6-005 as done (PR #61). Add session 2 log entry for vertical slice delivery. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
4.5 KiB
4.5 KiB
Mission Scratchpad — MVP
Append-only log. NEVER delete entries. NEVER overwrite sections. This is the orchestrator's working memory across sessions.
Original Mission Prompt
Active mission detected: MVP. Read the mission state files and report status.
User confirmed: start the planning gate.
Planning Decisions
2026-03-13 — Milestone and task breakdown
- PRD defines 8 phases (Phase 0–7), mapped 1:1 to Gitea milestones
- 59 issues created on git.mosaicstack.dev/mosaic/mosaic-stack (#1–#59)
- Each phase has a verification task as the final issue
- Task IDs use P{phase}-{seq} format (P0-001 through P7-008)
- Repo created as
mosaic/mosaic-stack(private) on Gitea - Milestones: ms-157 (Phase 0) through ms-164 (Phase 7)
- Total: 59 tasks across 8 milestones
Phase structure
| Phase | Version | Tasks | Focus |
|---|---|---|---|
| 0 | v0.0.1 | 9 | Foundation — monorepo, types, db, auth, OTEL, Docker, CI |
| 1 | v0.0.2 | 9 | Core API — gateway, brain, queue, routes, WebSocket |
| 2 | v0.0.3 | 7 | Agent Layer — Pi SDK, multi-provider, routing, coord |
| 3 | v0.0.4 | 8 | Web Dashboard — Next.js, chat, tasks, projects, admin |
| 4 | v0.0.5 | 7 | Memory & Intelligence — memory, log, summarization, skills |
| 5 | v0.0.6 | 5 | Remote Control — Discord, Telegram, SSO |
| 6 | v0.0.7 | 6 | CLI & Tools — CLI, prdy, quality-rails, installer, TUI |
| 7 | v0.1.0 | 8 | Polish & Beta — MCP, providers, E2E, docs, release |
Session Log
| Session | Date | Milestone | Tasks Done | Outcome |
|---|---|---|---|---|
| 1 | 2026-03-13 | Planning | Planning gate | Milestones created, 59 issues created, TASKS.md populated, manifest updated |
| 2 | 2026-03-13 | Vertical slice | P1-001, P1-007, P1-008, P2-001, P5-002, P6-005 | Communication spine built and merged (PR #61). Gateway + TUI + Discord. 3-agent gatekeeper review, 10/16 issues remediated, 4 deferred. |
Open Questions
(none at this time)
Corrections
2026-03-13 — Vertical slice reorder (Jason directed)
Original plan: Linear Phase 0 → 1 → 2 → ... execution.
Correction: Vertical slice first. Scaffold monorepo, then build the Pi TUI → Gateway → Discord communication spine end-to-end before backfilling auth, brain, memory, CRUD, etc.
Why: Validate the architecture's core message flow before investing in horizontal layers. If the communication channels don't work, nothing else matters.
Revised execution sequence:
| Step | Tasks (cross-phase) | What it proves |
|---|---|---|
| 1 | P0-001: Scaffold monorepo | Build system works |
| 2 | P0-005: Docker Compose (PG + Valkey) | Infrastructure runs |
| 3 | P0-002: @mosaic/types (minimal — gateway, agent, chat types) | Shared contracts |
| 4 | P1-001: Gateway scaffold (minimal NestJS + Fastify) | API surface boots |
| 5 | P1-007: WebSocket server (chat streaming) | Real-time channel works |
| 6 | P1-008: Basic agent dispatch (single provider) | LLM responds |
| 7 | P2-001: @mosaic/agent — Pi SDK integration (minimal) | Pi sessions work |
| 8 | P6-005: Pi TUI integration (mosaic tui → gateway) | TUI ↔ Gateway proven |
| 9 | P5-001: Plugin host (channel plugin interface) | Plugin arch works |
| 10 | P5-002: Discord plugin (bot + channel) | Discord ↔ Gateway proven |
| — | Then backfill: auth, brain, db, queue, OTEL, CI, web dashboard, etc. |