Files
stack/docs
jason.woltjeandClaude Opus 5.5 0f5b7cb9be docs(records): Sage lead handover, rows 23-25 state, row 8 stub, BUILD-LOG rebuilt on HEAD
Records Jason's 2026-09-26 ruling: Sage leads the project, Darkwing is a
collaborating seat, development stays in T3, and the old ~/.mosaic fleet is
being retired. The lead role adds no push, merge or deploy authority.

- QUEUE rows 23-25 show their commits and pushes; row 8 links a parked stub
  brief listing the rulings Jason must make before fleet seats move.
- Shared records from Darkwing (rows 6, 16, 18, 22, #1511, #1512) and Dewey
  (row 5) that were waiting on one owner for the shared files.
- DEFERRED: T3 headers counted as human in the ledger (#1506), #1509 engine
  test leak and busy gap, #1512 re-run outcome.
- BUILD-LOG.md rebuilt as HEAD plus the uncommitted entries; the working copy
  had dropped the row 23-25 entries. Diff against HEAD is additions only.

All eight suites green. Not pushed.

Co-Authored-By: Claude Opus 5.5 <[email protected]>
2026-09-26 14:59:24 -05:00
..
2026-09-03 16:34:20 -05:00